6.

 

 Mounting: 

 

                         

    

 

 

 

 

 

 

ATTENTION! :

 Consider the rotation direction of the actuator. The box is factory presetted to be installed parallel to CCW 

rotating actuators (Normal acting). For installation on reverse acting actuator or perpendicular to the actuator, the cams inside 
the box need to be reset before operating the system to avoid damages to the cams or to the sensors.                                                                    

6.1

 

The box has on the bottom surface a drilling according to ISO 5211, as shown in the image. Fix the proper mounting bracket 
(supplied in option by Eisenbau) to the box using M6 screws (6). 

6.2

 

Move the actuator to a completely 

“Open” or “Close” position, then align the box shaft (3) to actuator slot (7) ensuring of their 

correct coupling. 

6.3

 

The box is designed, assembled and controlled to ensure a maximum operating torque, at the shaft, lower than 0,5Nm. An 
excessive  misalignment  of the  two shafts  during  coupling, may  result in the  increase  of this torque  value  until reaching  the 
complete seizure of the shaft in the worst cases. Eccentricity between the two shafts must not exceed 0.2 mm.  

6.4

 

The motion transmission from the actuator or valve to the box GD is attained by a mechanical coupling. Before installation on 
a valve or an actuator, make sure that the orientation of the position indicator is correct. 

6.5

 

Operate the actuator before making the electrical wiring to ensure proper alignment between box and actuator . If it should be 
necessary,  re-align  box  by  loosening  mounting  bolts  (6)  and  retighten  bolts  to  the  actuator  (8)  according  to  the  required 
direction of rotation when satisfied with alignment.  

6.6

 

Replace the protective caps with suitably certified and temperature rated cable glands and blanking plugs permitted for use 
with ATEX/IECEx flameproof enclosures. 

 

7.

 

Electrical Wiring: 

   

caution  !  : 

The  electric  components  inside  the  box  may  carry  dangerous  voltage.  The  box  must  not        electrically 

connected during installation.

 

       Follow switch adjustment, wiring instructions (if present) and indicator setting before servicing the limit switch box. 

Make sure that the characteristics of the electrical connection are compatible with electrical parameters of operation of the Limit 
switch box. 

Do not exceed the limit switch performance limitation. Exceeding the limitation may cause damage to the limit switch, 

actuator and valve. Connect earth conductor.

 

  

attention ! :

 

the minimum clearance required to remove the box cover is 60mm.      

 
  

 

Box mounted parallel

 

to the actuator

 

Fix the bracket 

to the box 

Fix the bracket 

to the actuator 

Box mounted perpendicular

 

to the actuator

 

Ø50 iso f05 
According to 
iso 5211 n° 4 
holes – m6x10 

Additional mounting 
holes (on request) 

Summary of Contents for GuaRdboX GD Series

Page 1: ...alves or actuators which drive the process valves from closed to open position Normal acting or from open to closed position Reverse acting Normal acting is considered full CW when the process valve i...

Page 2: ...acteristics of the electrical connection are compatible with electrical operation parameters of operation of the box 3 5 Do not exceed the limit switch box performance limitation Exceeding the limitat...

Page 3: ...r repair of the flameproof enclosure is permitted For additional assistance please contact the manufacturer 3 19 CAUTION The metallic alloy used for the housing material may be at the accessible surfa...

Page 4: ...2 mm 6 4 The motion transmission from the actuator or valve to the box GD is attained by a mechanical coupling Before installation on a valve or an actuator make sure that the orientation of the posit...

Page 5: ...3 Metric thread conform to UNI 5870 1971 NPT thread conform to ANSI ASME B1 20 1 1983 7 5 Unscrew the six box cover captive screws 8 then remove the box cover 7 7 6 Use cables suitable for temperatur...

Page 6: ...s are factory presetted in order to operate in a box installed parallel See section 6 Mounting to CCW rotating actuators Normal acting The lower cam 1 is regulated to operate the switch in the full CW...

Page 7: ...Pi PN inductive proximity inductive proximity namur Board assembly Turn the actuator pinion full CW and regulate the cam till the switch 1 is activated Turn the actuator pinion full CCW and regulate t...

Page 8: ...tion of mounting screws bolts O rings and terminal wiring for signs of loosening or corrosion as part of the routine plant maintenance 10 3 Guardbox boxes have been projected to withstand the most sev...

Reviews: