PIK-20 E Service manual
A
— Insert the horizontal stabilizer by moving the trim and flap lever to the
foremost position and by lifting the leading edge up a little and by
pushing the ball bearings (1) and (2) on to the pins (3) and (4) on the
vertical stabilizer.
— Pull out the locking pin (5) with a tool (Fokker-pin of the wing bolt)
and push the leading edge into place. Remove the tool and push the
locking pin in. Ensure that the front fitting is engaged and secure the
pin using a Fokker-pin.
— Deflect the elevator upwards and connect the elevator control rod (6)
and secure it using a Fokker-pin.
1.4. Disassembly
— The wings and horizontal stabilizer are removed in the reverse
sequence to assembly.
EIRI KY
y
Kisällinkatu 8
SF-15170 Lahti 17
page II-4