2.3  PREPARING THE ENCLOSURE 

To mount the 5500 Btu unit you will need to cut an opening in your enclosure and drill mounting holes.  A cut-

out drawing (Fig. 2.3) showing the cut-out size and hole locations has been included in this manual (see Fig. 2.3).  The 
instructions for installing the air conditioner are printed below.   

TOOLS AND MATERIALS NEEDED: 

 

Pencil 

 

Tape Measure 

 

Jigsaw or suitable alternative 

 

Electric drill 

 

17/64 (H) drill bit 

 

(20) ¼-20 x ½” stainless machine screws (supplied) 

 

(20) washers (supplied) 

 

(20) ¼-20 nuts (supplied) 

 

One neoprene gasket (supplied) 

 
CUT THE OPENING AND DRILL MOUNTING HOLES IN THE ENCLOSURE 

1.

 

Using the guidelines provided in the installation manual choose an appropriate location for the air conditioner 
on your enclosure. 

2.

 

Layout the cut-out and hole pattern for the AC on the enclosure.  Refer to Figure 2.3.   

3.

 

Before  cutting  or  drilling  check  that  the  location  meets  the  clearance  requirements  as  specified  in  the 
installation manual.   

4.

 

Using  a  pencil,  center  punch  or  other  method,  mark  the  exact  center  point  of  each  mounting  hole  on  the 
enclosure 

5.

 

Using the jigsaw, cut the opening in the enclosure. 

6.

 

Using the 17/64 drill bit, drill a hole at each of the marks you made earlier. 

 

2.4  INSTALLING THE AIR CONDITIONER 

INSTALL THE AIR CONDITIONER 

1.

 

Lay the air conditioner down with the cold side (side with the thermostat) facing up. 

2.

 

Take the supplied gasket and lay it down on the flange. 

3.

 

Take one of the supplied mounting screws and, from the under side of the flange, push it up through the top 
right mounting hole, and through the hole in the gasket.  The gasket hole is undersized and will hold the screw 
in place.  Repeat this on the top left mounting hole.   

4.

 

Set the AC unit in the hole you’ve cut in the enclosure, and using a screwdriver, carefully start the two screws 
you attached to the gasket to the tapped holes in the enclosure.  Do not tighten these at this time. 

5.

 

Install the rest of the screws in the flange placing a nylon washer on each fastener and screw them into the 
holes in the enclosure.  Do not tighten them completely. 

6.

 

Remove the two starter screws and place a nylon washer on each and reinstall. 

7.

 

Tighten all screws. 

 
 
 
 
 
 
 

Summary of Contents for AAC-170 Series

Page 1: ...oelectric Air conditioner installation and operation manual FOR 5500 Btu MODEL S AAC 170 4XT AAC 170 4XT HC AAC 170 XXXXX Cooling Solutions for Cooling Solutions for Cooling Solutions for Cooling Solutions for Mission Mission Mission Mission Critical Electronics Critical Electronics Critical Electronics Critical Electronics ...

Page 2: ...ALLING THE AIR CONDITIONER 6 2 5 INSTALL THE DRAIN LINES 8 2 6 APPLY POWER 9 3 OPERATION 3 1 THERMOSTAT SET POINTS AND HEATING COOLING UNITS 10 3 2 MAINTENANCE 10 EIC SOLUTIONS INC EIC SOLUTIONS INC EIC SOLUTIONS INC EIC SOLUTIONS INC 700 VETERANS WAY SUITE 200 WARMINSTER PA 18974 PHONE 1 215 443 5190 or 1 800 497 4524 FAX 215 443 9564 EMAIL info eicsolutions com VISIT US ON THE WEB AT www eicsolu...

Page 3: ...e practical for real world applications and are now found in everything from consumer goods to spacecraft Your EIC Solutions Thermoelectric Air Conditioner operates on this principle so there is no compressor and no expensive ozone depleting CFC s EIC s air conditioners use Thermoelectric modules sandwiched between high performance aluminum heat sinks high CFM axial fans and a patented electronic ...

Page 4: ...closure See Figure 2 1 and 2 2 Vertically mounted mounted on the side of an enclosure 5500 BTU units are always mounted with the exposed heatsink fins facing left and right Fig 2 1 The unit cannot be mounted vertically and turned 90 degrees with the exposed heatsink fins at the top and bottom The AAC 170 4XT is equipped with a built in vertical condensate drip pan Once installed the drain hoses mu...

Page 5: ...5 5 5 5 1 800 497 4524 EIC SOLUTIONS INC 215 443 5190 FIGURE 2 1 FIGURE 2 2 ...

Page 6: ... 4 Using a pencil center punch or other method mark the exact center point of each mounting hole on the enclosure 5 Using the jigsaw cut the opening in the enclosure 6 Using the 17 64 drill bit drill a hole at each of the marks you made earlier 2 4 INSTALLING THE AIR CONDITIONER INSTALL THE AIR CONDITIONER 1 Lay the air conditioner down with the cold side side with the thermostat facing up 2 Take ...

Page 7: ...7 7 7 7 1 800 497 4524 EIC SOLUTIONS INC 215 443 5190 FIG 2 3 ...

Page 8: ...ded with the AC unit Review the Fig 2 4 below for suggested drain line configurations FIG 2 4 YOU MUST USE THE FACTORY INSTALLED HORIZONTAL DRIP PAN IF YOU INSTALL THE AIR CONDITIONER HORIZONTALLY FIG 2 2 ON THE TOP OF YOUR ENCLOSURE FAILURE TO DO SO MAY ALLOW CONDENSATE TO DRIP IN AN UNCONTROLLED MANNER CAUSING DAMAGE TO YOUR EQUIPMENT ...

Page 9: ...rs are as follows Black or Brown line White or Blue line neutral Green or Green Yellow ground Amperage for 220 VAC unit is 10 3 amps Upon applying power to the air conditioner the fans on the cold side inside the enclosure will come on The hot side fans outside the enclosure may also run depending on where the thermostat is set The cold side fans always run to circulate air within your enclosure t...

Page 10: ...C Thermoelectric Air Conditioners are virtually maintenance free The only time maintenance is required is when a unit is installed in an extremely dirty environment In these cases the hot side heat sinks outside the enclosure should be inspected regularly for a build up of dust or dirt If a build up is present on the heat sink fins it can be easily removed as follows 1 Disconnect the power from th...

Reviews: