11
Use
After each readjustment always check that the screws are tightly
fixed so that safe operating of the drill rig is possible.
Mounting the turnstile
▪
Mount the turnstile (1) on the
right or left side of the carriage
(2) depending on the work to be
performed.
▪
Check whether the turnstile (1) is
fixed tightly.
Fastening of the Drill Rig
Fastening by means of dowels in brickwork:
For brickwork, Brickwork-
Dowels must be used.
▪
Mark the position of the drill holes for the fastening
on the surface to be drilled.
▪
Drill a hole (Ø 18mm) 50 mm deep (A), into which
the Brickwork-Dowel (B) is to be placed; insert the
dowel.
2
1
▪
Screw the quick action clamping screw (D) into
the dowel.
▪
Install the drill rig.
▪
Fix the washer (E) and finally the fastening nut
(F) on the quick action clamping screw (D).
▪
Tighten the fastening nut (F) with a wrench
SW 27.
▪
Before and after tightening the nut (F), the 4
adjustable screws have to be adjusted in order
to adapt the rig to the surface.
Do check whether the
drill rig is installed safely
and firmly.
B
E
D
A
F