background image

DOC

EG-IM-GGHC20200313

 

Changzhou EGing Photovoltaic Technology Co., Ltd 
Add

No.18, Jinwu Road, YaotangTown,Jintan District, Changzhou City, Jiangsu, China 

Web

www.egingpv.com

      Email

[email protected]

      TEL

+86-0519-82588999/82585885 

Date:Mar. 2020                                                                                                                                Page: 

8 / 14 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       

4

:压块与支架连接示意图

 

Figure 4

  Bolted connection between block and mounting bracket   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

:接地孔安装示意图

 

Figure 5

Schematic diagram of ground installation

 

 

Summary of Contents for EG-M72-BF-DG Series

Page 1: ...tion 1 2 Disclaimer 1 3 General 1 4 Mechanical Installation 2 4 1 Select the Location 2 4 2 Tilt Angle 3 4 3 Selecting the Proper Support Structure and Hardware 3 4 4 Installing Security 4 4 5 Install...

Page 2: ...rules that this manual mentioned The installation workers must be familiar with the mechanical and electrical requirement of the product 2 Disclaimer EGing reserves the right to modify and update the...

Page 3: ...storage unless you reach the installation site otherwise do not open the package of the modules Follow all safety precautions of other components used in the system 4 Mechanical Installation Regardle...

Page 4: ...rature from 20 to 46 the limit working environment temperature of the module is 40 85 4 2 Tilt Angle The tilt angle of the PV module is the angle between the PV module and a horizontal ground surface...

Page 5: ...ior 4 4 Installing Security Select the appropriate mounting height when modules installation on the ground to prevent the lower half of the modules from being covered by snow for long time in the wint...

Page 6: ...open the box of modules Please protect modules package handle gently when unload modules neverdrop modules directly Do not Stampede modules Do not disassemble modules remove any nameplate or adhered p...

Page 7: ...ndle the cables together with Insulation beam The cables scattering down from the junction box may lead to various problems such as animal bites or leakage in the puddles The cable should not be in pl...

Page 8: ...of the modules Do not block the battery sheet when installing the bracket The distance from the center of the two side blocks to the short side of the modules must be between 306 25mm The distance be...

Page 9: ...inwu Road YaotangTown Jintan District Changzhou City Jiangsu China Web www egingpv com Email eging egingpv com TEL 86 0519 82588999 82585885 Date Mar 2020 Page 8 14 4 Figure 4 Bolted connection betwee...

Page 10: ...ing position of the block is located on the long side of the modules The mounting bracket is parallel to the long side of the modules Do not block the battery sheet when installing the bracket The dis...

Page 11: ...nwu Road YaotangTown Jintan District Changzhou City Jiangsu China Web www egingpv com Email eging egingpv com TEL 86 0519 82588999 82585885 Date Mar 2020 Page 10 14 9 Figure 9 Bolted connection betwee...

Page 12: ...e to the protective diodes 3 4 0 mm2 40 120 This module is supplied withjunction box containing cables and connectors Refer to related standards to determine system wiring size types andtemperature ra...

Page 13: ...g frame the frame surface must be electroplated to ensure a good conductivity The negative pole must also be grounded otherwise the guarantee will fail 5 3 Electrical Safety 1 Contact with electricall...

Page 14: ...ule must be carried out especially during the warranty period It is the responsibility users must bear When the module gets damaged inform the supplier in time usually 2 weeks 5 If the angle of the PV...

Page 15: ...es under STC Type of cells Type of Module Maximum power Pmax W Operating Voltage Vmp V Operating Current Imp A Open Circuit Voltage Voc V Short Circuit Current Isc A Max Series Fuse Rating A system vo...

Reviews: