background image

DOC

EG-IM-GGHC20200313

 

Changzhou EGing Photovoltaic Technology Co., Ltd 
Add

No.18, Jinwu Road, YaotangTown,Jintan District, Changzhou City, Jiangsu, China 

Web

www.egingpv.com

      Email

[email protected]

      TEL

+86-0519-82588999/82585885 

Date:Mar. 2020                                                                                                                                Page: 

6 / 14 

of  rainfall  water  or  condensed  water  will  lead  to  corrosion  of  the  glass  panel  and  adhesive  substance 

(theencapsulating material between the front and rear glass).

 

 

请勿在组件的表面刷油漆或其他任何材料的粘胶剂。

 

Do not use paint or any other adhesive materials onto the surface of modules.

 

 

当组件潮湿时不要操作,除非穿戴有合适的防电击装备。

 

Do not operate when module is wet, unless wearing suitable protectionequipment against electric shock.

 

 

请勿在雨雪天气或者大风条件下安装组件。

 

Do not install modules in rainy, snowy, or windy conditions.

 

 

插紧连接器,确保导线通路;在负载工作的情况下,不要直接拔开连接器。

 

Plug  connectors  firmly,  ensuring  that  the  wires  are  connected;  Do  not  unplug  the  connectors  directly 

while they are working.

 

 

更换组件时,请勿损坏周围的组件和安装结构。

 

Do not damage the surrounding modules and mounting structure while exchanging modules.

 

 

用绝缘束将线缆捆绑在一起。从接线盒散落下来的线缆可能会导致诸如动物啃咬和在水坑中漏电的各种问

题。

 

Bundle the cables together with Insulation beam. The cables scattering down from the junction box may 

lead to various problems such as animal bites or leakage in the puddles.

 

 

安装之后线缆应该位于不会被阳光直接曝晒的地方,以防止线缆老化。

 

The cable should not be in places of direct sunshine to prevent cable aging.

 

 

为了更好的防水效果,建议在组件安装时将接线盒端放置在支架上侧。

 

For better waterproof effect, it is recommended that the junction box port is placed on the upper of the 

support when installing modules.

 

4.5

 

安装方式

Installation 

请确保安装手册中所描述的所有信息适用于你的安装。请仔细检查说明和图纸,不按其中的方式安装
组件可能会使您的质保无效。

这些安装方法的正面设计载荷为

3600Pa

,背面设计载荷为

1600Pa

(安全

因子为

1.5

 

Please make sure that all the information described in the installationmanual is proper for your installation.Please 

review the descriptions and drawings carefully; not mounting the modules according to one of these methods may 

void your warranty. These mounting methods are designed for front side to allow module loading of 3600Pa and 

back side to allow module loading of 1600Pa

a safety factor of 1.5

 

4.5.1

EG-***P72-HC/BF-DG

EG-***M72-HC/BF-DG

组件安装方式

 

Installation of 

EG-***P72-HC/BF-DG and EG-***M72-HC/BF-DG 

对于

EG-***P72-HC/BF-DG

EG-***M72-HC/BF-DG

系列组件,尺寸为

2012*994*30mm

 

For the EG-***P72-HC/BF-DG and EG-***M72-HC/BF-DG series of glass- glass module, the size is 

2012*994*30mm. 

 

 

 

Summary of Contents for EG-M72-BF-DG Series

Page 1: ...tion 1 2 Disclaimer 1 3 General 1 4 Mechanical Installation 2 4 1 Select the Location 2 4 2 Tilt Angle 3 4 3 Selecting the Proper Support Structure and Hardware 3 4 4 Installing Security 4 4 5 Install...

Page 2: ...rules that this manual mentioned The installation workers must be familiar with the mechanical and electrical requirement of the product 2 Disclaimer EGing reserves the right to modify and update the...

Page 3: ...storage unless you reach the installation site otherwise do not open the package of the modules Follow all safety precautions of other components used in the system 4 Mechanical Installation Regardle...

Page 4: ...rature from 20 to 46 the limit working environment temperature of the module is 40 85 4 2 Tilt Angle The tilt angle of the PV module is the angle between the PV module and a horizontal ground surface...

Page 5: ...ior 4 4 Installing Security Select the appropriate mounting height when modules installation on the ground to prevent the lower half of the modules from being covered by snow for long time in the wint...

Page 6: ...open the box of modules Please protect modules package handle gently when unload modules neverdrop modules directly Do not Stampede modules Do not disassemble modules remove any nameplate or adhered p...

Page 7: ...ndle the cables together with Insulation beam The cables scattering down from the junction box may lead to various problems such as animal bites or leakage in the puddles The cable should not be in pl...

Page 8: ...of the modules Do not block the battery sheet when installing the bracket The distance from the center of the two side blocks to the short side of the modules must be between 306 25mm The distance be...

Page 9: ...inwu Road YaotangTown Jintan District Changzhou City Jiangsu China Web www egingpv com Email eging egingpv com TEL 86 0519 82588999 82585885 Date Mar 2020 Page 8 14 4 Figure 4 Bolted connection betwee...

Page 10: ...ing position of the block is located on the long side of the modules The mounting bracket is parallel to the long side of the modules Do not block the battery sheet when installing the bracket The dis...

Page 11: ...nwu Road YaotangTown Jintan District Changzhou City Jiangsu China Web www egingpv com Email eging egingpv com TEL 86 0519 82588999 82585885 Date Mar 2020 Page 10 14 9 Figure 9 Bolted connection betwee...

Page 12: ...e to the protective diodes 3 4 0 mm2 40 120 This module is supplied withjunction box containing cables and connectors Refer to related standards to determine system wiring size types andtemperature ra...

Page 13: ...g frame the frame surface must be electroplated to ensure a good conductivity The negative pole must also be grounded otherwise the guarantee will fail 5 3 Electrical Safety 1 Contact with electricall...

Page 14: ...ule must be carried out especially during the warranty period It is the responsibility users must bear When the module gets damaged inform the supplier in time usually 2 weeks 5 If the angle of the PV...

Page 15: ...es under STC Type of cells Type of Module Maximum power Pmax W Operating Voltage Vmp V Operating Current Imp A Open Circuit Voltage Voc V Short Circuit Current Isc A Max Series Fuse Rating A system vo...

Reviews: