Installation and start-up of UPS PEGASUS II
10-40 kVA
36
Rev.A 15/05/2012
4.3.1 Battery connection and positioning
Battery voltage
After the battery installation,
before closing BCB,
check the battery voltage on the
BCB circuit breaker.
In case of not directly supplied cabling, please connect the cables to the battery
breaker (BCB) as shown in the below picture.
Picture 8
–Cabling of BCB fuse holder