1. HOT FILM
10. After checking the status of lamination, Place the pressure lever at the proper
lamination mode.
6. Allow some of the film with melted resin to stick to the Guiding Paper.
7. Repeat step 5 with lower roll film then stick it to the Guiding Paper.
fed through to the rear roller without tension.
8. Unwind 30~40cm(1~1.3ft) of both rolls of film, to loosen the film tension. This should be
1. Insert the bar into the core of roll film then place the bar on the machine.
HANGING FILM
beyond the second set of rollers.
9. Set speed at 1 and press the "RUN" button to feed film into the machine.
2. Place the Pressure Lever to the open mode (10~13mm).
3. Insert a piece of lightweight cardboard (Guiding Paper) between the rollers, through to
**IMPORTANT
: It should reach beyond the second set of rollers. It should stick out
5cm (2") in front of front roller.
4. Pull the upper film around the upper idler bar to the anti-wrinkle device and stretch out
the film on the upper heat shoe.
5. When the temperature reaches 80°C (176°F), the resin is melting, stick the film on the
shoe.
SHAFT
LOWER IDLE BAR
UPPER ROLL FILM
SHAFT
LOWER ROLL FILM
GUIDING PAPER
HEAT SHOE
UPPER IDLE BAR
LOWER FILM
SHAFT
LOWER IDLE BAR
HEAT SHOE
Picture 1
- 8 -
EDNord - Istedgade 37A - 9000 AAlborg - telefon 96333500