28
ENGLISH
System set-up as sole source of heat with boiler to produce hot sanitary water.
This diagram is purely indicative. The plumber is responsible for a correct installation.
System with production of stored hot sanitary water with Idrokit combined with boiler.
This diagram is purely indicative. The plumber is responsible for a correct installation.
KEY
ACS:
Hot sanitary water
AF:
Cold water
AL:
Water mains supply
C:
Filling/Top-up Section
CE:
Electronic panel
EV:
3-way solenoid valve
NA:
Normally open
NC:
Normally closed
GR:
Pressure reducer
Ja:
Automatic relief valve
Jm:
Manual relief valve
MI:
System flow
MT:
Thermostatic mixer
P:
Pump (circulator)
RA:
Radiators
RI:
System return
S:
Drain
SC30:
30-plate exchanger
ST:
Temperature sensor
TC:
Contact thermostat
TS:
Thermal stove
V:
Ball valve
Vec:
Closed expansion tank
VR:
Check valve
VSPT:
Safety Pressure and Temperature Valve
HYDRAULIC CONNECTIONS
ATTENTION: the power to the radiators decreases when Hot Sanitary Water is produced.
ACCESSORIES
Edilkamin accessories have been used in the above diagrams.
• IDROKIT for the production and storage of hot sanitary water (code 601750)
• 200-litre boiler (code 633230) or 300-litre boiler (code 633240)
to produce and store hot sanitary water.
Individual spare parts are also available (exchanger, valves, etc). For information, please contact your local dealer.
KEY
ACS:
Hot sanitary water
AL:
Water mains supply
B:
Boiler
C:
Filling/Top-up Section
EV2:
2-way solenoid valve
EV3:
3-way solenoid valve
NA:
Normally open
NC:
Normally closed
GR:
Pressure reducer
MI:
System flow
P:
Pump (circulator)
RA:
Radiators
RI:
System return
S:
Drain
TS:
Thermal stove
V:
Ball valve
Vec:
Closed expansion tank
VSP:
Safety valve
manifold
manifold
internal stove components
internal stove components
sk tecnica mimì-norma multilingue vers C 30 11 2010.qxp 30/11/2010 15.27 Pagina 29