4
Dimensions ................................................ 2
Ratings and Capacity .................................. 3
Safety Symbols .......................................... 5
Locating the Boiler ...................................... 6
System Piping ............................................ 7
Installation - System Piping ........................10
Fresh Air for Combustion ............................11
Chimney and Vent Pipe Connection ..............12
Vent Damper Operation ..............................14
Gas Supply Piping ......................................15
Electrical Wiring ........................................16
Operating Instructions ................................17
Operating Your Boiler .................................18
Checking and Adjusting ..............................19
Start-up Cleaning ......................................21
General Maintenance .................................22
Service Hints ............................................23
Wiring Diagrams ........................................24
Wiring diagrams ........................................25
Controls and Accessories ............................26
Repair Parts ..............................................27
TABLE OF CONTENTS
KEEP THIS MANUAL NEAR BOILER
RETAIN FOR FUTURE REFERENCE
GAS FIRED STEAM BOILERS
Check our website frequently for updates: www.ecrinternational.com
Information and specifications outlined in this manual in effect at the
time of printing of this manual. ECR International reserves the right to
discontinue, change specifications or system design at any time without
notice and without incurring any obligation, whatsoever.
Introduction
Boiler is designed for use in closed heating systems where
all steam is returned as condensate and make-up water is
minimal. Boiler is not designed for or intended for use in
open systems using 100% make-up water.
Prior to Installation
• Verify correct boiler for type of gas being used
natural or propane. See Rating Plate.
• Verify boiler size and dimensions. See Figure 1 page 2.
• Verify ratings and capacity data for natural gas. See
Table 1 page 3.
Installation Requirements
• Supply boiler with correct gas (natural or propane),
fresh air for combustion, and suitable electrical supply.
• Connect boiler to adequate venting and piping
systems.
• Provide boiler with properly located and adjusted
thermostat.
Installation of boiler in building under construction, use
precaution to insure clean combustion air supply during
construction process. Airborne particulate from construction
materials can clog burner ports and cause incomplete
combustion and sooting.
Complete all steps for safe and proper heating system
operation.
Summary of Contents for Dunkirk Plymouth Steam PSB-3D
Page 9: ...9 Figure 4 Recommended Near Boiler Piping Using One Supply Tapping SYSTEM PIPING ...
Page 27: ...27 REPAIR PARTS ...
Page 28: ...28 REPAIR PARTS ...
Page 29: ...29 REPAIR PARTS ...
Page 30: ...30 REPAIR PARTS Safety Relief Valve 14 11 NPT X 4 Nipple PF 033 02 ...
Page 31: ...31 Date Service Performed Company Name Tech Initials Company Address Phone ...
Page 32: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...