6
LOCATING THE BOILER
Locating the Boiler
1.
Select level location as centralized with piping system,
and as near chimney as possible.
2.
Place crated boiler at selected location. Remove all
crate material. Please recycle responsibly.
WARNING
Fire hazard. Do not install boiler on combustible
flooring or carpeting. Failure to follow these
instructions could result in death or serious injury.
!
3.
Do not install boiler on carpeting. For installation
on non-combustible floors only. For installation on
combustible flooring, special base must be used. See
Repair Parts page 27.
4.
Use metal shims under boiler base legs for final leveling
if needed.
5.
Install boiler in location that permits satisfactory
combustion of gas, proper venting, and maintenance
of ambient temperature at safe limits under normal
conditions of use. Boiler location should not interfere
with proper circulation of air. Introduce outside air
if normal infiltration does not provide necessary
air.“Fresh Air for Combustion” on page 11.
6.
Notify owner to keep air passages free of obstruction.
Ventilating and combustion air must enter boiler room
without restrictions.
7.
Install boiler so automatic gas ignition system
components are protected from water (dripping,
spraying, rain, etc.) during appliance operation and
service.
Draft Hood Installation
WARNING
Asphyxiation, carbon monoxide hazard. Failure to
follow these instructions could result in improper
combustion and possible leakage of combustion
products into the living space.
!
Follow directions given in Figure 8. Attach draft diverter,
and blocked vent switch. Mount vent damper. See
"Connecting Vent Damper and Vent Connector" page 12.
See Wiring Diagrams page 25.
Table 2 -
Minimum Clearance Dimensions
Top
6"
Rear
6"
Control Side
7"
Opposite Side
6"
Front
Alcove
Flue/Vent
Connector
6"
Summary of Contents for Dunkirk Plymouth Steam PSB-3D
Page 9: ...9 Figure 4 Recommended Near Boiler Piping Using One Supply Tapping SYSTEM PIPING ...
Page 27: ...27 REPAIR PARTS ...
Page 28: ...28 REPAIR PARTS ...
Page 29: ...29 REPAIR PARTS ...
Page 30: ...30 REPAIR PARTS Safety Relief Valve 14 11 NPT X 4 Nipple PF 033 02 ...
Page 31: ...31 Date Service Performed Company Name Tech Initials Company Address Phone ...
Page 32: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...