3
1 -BOILER RATINGS & CAPACITIES
- SEA LEVEL RATINGS (NATURAL AND PROPANE GASES)
Table 1
Model
Input
(MBH)
(1)
Heating Capacity
(MBH)
(1)(2)
Net AHRI Rating
(MBH)
(1)
Shipping
Weight (lbs.)
AFUE
(2)
Flue Diameter
125
125
113
98
284
90.0
2” CPVC & 3” PVC
150
150
134
117
284
90.0
2” CPVC & 3” PVC
175
175
158
137
284
90.0
2” CPVC & 3” PVC
200
200
180
157
284
90.0
2” CPVC & 3” PVC
(1)
1 MBH = 1,000 Btuh (British Thermal Units Per Hour)
(2)
AFUE (Annual Fuel Utilization Effi ciency) and Heating Capacity is based on Department of Energy test procedure.
- Boiler Jackets
Figure 1
These low pressure gas-fi red hot water boilers are design certifi ed by CSA International, for use with natural and propane
gases. Boilers are constructed and hydrostatically tested for maximum working pressure of 50 psi (pounds per square
inch) in accordance with A.S.M.E. (American Society of Mechanical Engineers) Boiler and Pressure Vessel Code, Section IV
Standards for heating boilers.
Boilers are certifi ed in accordance with ANSI (American National Standards Institute) Z21.13 standards as gas-fi red, direct
vent, condensing, hot water boilers.
Heating Capacity indicates amount of heat available after subtracting losses up the stack. Most of this heat is available
to heat water. Small portion is heat loss from jacket and surfaces of boiler, it is assumed this heat stays in the structure.
Net AHRI Rating represents portion of remaining heat applied to heat radiation or terminal units (i.e. Finned tube
baseboard, cast iron radiators, radiant fl oor, etc.). Difference between Heating Capacity and Net AHRI Rating, called piping
and pickup allowance, establishes reserve for heating volume of water in the system and offsetting heat losses from
piping. Net AHRI Ratings shown are based on piping and pickup factor of 1.15. Net AHRI Rating of boiler selected should
be greater than or equal to calculated peak heating load (heat loss) for building or area(s) served by boiler and associated
hot water heating systems. Manufacturer should be consulted before selecting boiler for installations having unusual
piping and pickup requirements.