ECR International H20I60 Installation, Operation & Maintenance Manual Download Page 17

17

MODEL

BOILER

OUTPUT

(BTU/HR)

140 F

115 F

140 F

115 F

140 F

115 F

140 F

115 F

140 F

115 F

140 F

115 F

50,000

94

119

67

92

103

128

67

92

121

146

67

92

60,000

107

138

80

111

116

147

80

111

134

165

80

111

80,000

134

174

107

147

143

183

107

147

161

201

107

147

100,000

160

212

133

185

169

220

133

184

187

238

133

184

120,000

171

227

144

200

190

250

154

214

214

275

160

221

140,000

171

227

144

200

190

250

154

214

227

293

173

239

160,000

171

227

144

200

190

250

154

214

227

293

173

239

MODEL

BOILER

OUTPUT

(BTU/HR)

140 F

115 F

140 F

115 F

140 F

115 F

140 F

115 F

140 F

115 F

140 F

115 F

50,000

121

146

67

92

139

164

67

92

170

195

67

92

60,000

134

165

80

111

152

183

80

111

183

214

80

111

80,000

161

201

107

147

179

219

107

147

210

250

107

147

100,000

187

238

133

184

205

256

133

184

236

287

133

184

120,000

208

268

154

214

232

293

160

221

263

324

160

221

140,000

208

268

154

214

239

303

167

231

289

360

186

257

160 000

208

268

154

214

239

303

167

231

289

360

186

257

(GAL/HR)

1st HOUR

CONTINUOUS

(GAL/HR)

(GAL/HR)

(GAL/HR)

(GAL/HR)

(GAL/HR)

RATING

RATING

RATING

RATING

RATING

RATING

115

Boiler flow = 14 gpm

Boiler flow = 14 gpm

Boiler flow = 14 gpm

1st HOUR

CONTINUOUS

60 LOW

80

1st HOUR

CONTINUOUS

(GAL/HR)

(GAL/HR)

(GAL/HR)

(GAL/HR)

(GAL/HR)

(GAL/HR)

RATING

RATING

Boiler flow = 14 gpm

Boiler flow = 14 gpm

RATING

RATING

RATING

RATING

1st HOUR

CONTINUOUS

1st HOUR

CONTINUOUS

1st HOUR

CONTINUOUS

180 deg. F Boiler Supply

30 and 40LOW

40

60

IBR Rating Condition

Boiler flow = 14 gpm

Heat-Flo, Inc.

15 Megan Court, Uxbridge, MA 01569

Tel: 508-278-2400  Fax: 508-278-2466

www.heat-flo.com

160,000

208

268

154

214

239

303

167

231

289

360

186

257

MODEL

BOILER

OUTPUT

(BTU/HR)

140 F

115 F

140 F

115 F

140 F

115 F

140 F

115 F

50,000 139

164

67

92

170

195

67

92

60,000 152

183

80

111

183

214

80

111

80,000 179

219

107

147

210

250

107

147

100,000 205

256

133

184

236

287

133

184

120,000 232

293

160

221

263

324

160

221

140,000 258

330

186

258

289

361

186

258

160,000 285

368

213

296

316

398

213

295

180,000 312

405

240

333

343

435

240

332

200,000 339

442

267

370

370

473

267

370

220,000 343

473

271

401

396

509

293

406

240,000 362

473

290

401

412

531

309

428

250,000 362

473

290

401

412

531

309

428

RATING

RATING

RATING

RATING

(GAL/HR)

(GAL/HR)

(GAL/HR)

(GAL/HR)

Boiler flow = 21 gpm

Boiler flow = 21 gpm

1st HOUR

CONTINUOUS

1st HOUR

CONTINUOUS

High Output Units - 80-HO and 115-HO - 21 gpm boiler flow

80-HO High Output

115-HO High Output

Heat-Flo, Inc.

15 Megan Court, Uxbridge, MA 01569

Tel: 508-278-2400  Fax: 508-278-2466

www.heat-flo.com

180 deg. F Boiler Supply

IBR Rating Condition

Summary of Contents for H20I60

Page 1: ...Company ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com Information and specifications outlined in this manual in effect at the time of printing of this manual...

Page 2: ...can cause personal injury or death Read all instructions including all those contained in component manufacturers manuals before installing starting up operating maintaining or servicing the water hea...

Page 3: ...e gas supplier s instructions or if the supplier is unavailable contact the fire department IMPORTANT SAFETY INSTRUCTIONS WARNING When using electrical appliances basic safety precautions to reduce th...

Page 4: ...l based on the expected water usage for the given site The average residence with one shower or more will require a Model 40 or larger The Model 30 should only be considered for residences with minima...

Page 5: ...42 7 1 34 0 26 0 3 4 1 150 100 H2OI50 60 8 0 52 0 22 5 3 4 1 150 110 H20I60 60 8 4 60 0 22 5 3 4 1 150 125 H20I60L 60 7 5 44 0 26 5 3 4 1 150 120 H2OI80 80 8 0 54 0 26 5 1 1 150 140 H2OI115 115 8 9 72...

Page 6: ...215 117 900 10 0 2 8 H2OI50 222 290 177 245 132 800 10 0 3 1 H20I60 240 311 186 257 139 400 10 0 3 2 H20I60L 220 284 166 230 124 500 10 0 2 9 H2OI80 257 328 185 256 138 600 12 0 3 7 H2OI115 309 388 2...

Page 7: ...ne The water heater is controlled with an additional zone valve Select a valve with a low pressure drop and assure minimum flow with adequate pipe sizing B Priority or Non Priority for Hot Water 1 Opt...

Page 8: ...iler system during service 2 Unions Allows for easy locating or removal 3 Vacuum breaker Protects water heater from collapse if a hot tank is valved off to service other components in the system 4 The...

Page 9: ...pen Drain the domestic water system 2 Position the water heater in the final location 3 Connect the cold water supply piping Install piping onto cold inlet connection Connect to cold water supply conn...

Page 10: ...hat uses Zone Valves refer to Figure 3 The water heater connection labeled BOILER SUPPLY should be piped to the boiler supply piping after the air purger and before the space heating circulator Mount...

Page 11: ...11 Figure 2 Typical Mixing Valve Install Figure 1 Domestic Water Piping Pipe Relief Valve Discharge to within 6 of floor see Section III Notes...

Page 12: ...temperatures at hot water taps you must take special precautions Use lowest possible temperature setting Install some type of tempering device such as an automatic mixing valve at hot water tap or wat...

Page 13: ...erature in the water heater If it is set too high the resulting hot water can cause painful scalding with possible serious and permanent injury The temperature at which this occurs varies with a perso...

Page 14: ...ing our ARM 4P Panel Product features include Build in transformer that will support up to 15 zones Transformer has electronic fuse protection 1 to prevent transformer overloading Data Port Terminal f...

Page 15: ...15 BOILER T T BOILER T T BOILER T T...

Page 16: ...er will prevent this problem Symptoms are identical to sediment buildup If repeated flushing does not resolve the problem chemical cleaning may be required Contact a qualified contractor VII Troublesh...

Page 17: ...0 1st HOUR CONTINUOUS GAL HR GAL HR GAL HR GAL HR GAL HR GAL HR RATING RATING Boiler flow 14 gpm Boiler flow 14 gpm RATING RATING RATING RATING 1st HOUR CONTINUOUS 1st HOUR CONTINUOUS 1st HOUR CONTINU...

Page 18: ...18...

Page 19: ...st price for a second coil REPLACEMENT PARTS Part Part No Description List Price T P Relief Valve TP 3 150 psi 210deg F 4 probe ANSI AGA Cert 22 35 Thermostat L4080 Honeywell L4080B 59 63 Thermostat W...

Page 20: ...the Product shall be ten 10 years from the date of manufacture of the Product WARRANTY COVERAGE FOR COMMERCIAL USAGE The following limited warranty set forth in this section shall apply to only the or...

Page 21: ...NTY ACT THE FOREGOING WARRANTIES ARE EXCLUSIVE AND ARE GIVEN AND ACCEPTED IN LIEU OF ANY AND ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING WITHOUT LIMITATION THE IMPLIED WARRANTIES OF MERCHANTABIL...

Page 22: ...22 NOTES...

Page 23: ...23 NOTES...

Page 24: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13504 4729 web site www ecrinternational com H2 O...

Reviews: