5.6. Sewage (option)
The test of sewage installations acc. to DIN 1610 is
registered as a control pragram in the
ecom-DP3
.
Proceed as follows:
1. Scroll with the cursor keys
<up/down>
to the
menu point
„Sewage“
. Activate the menu point with
<Enter>
.
2. Check if necessary the values of stabilisation time,
measurement time and test pressure with
<F1>
(back with
<ESC>
).
3. Connect the testing balloons as described.
4. Start the control program with
<Enter>
and built
up the adjusted pressure.
5. Wait for stabilisation time (if the pressure remains
in the range „test pr/- 10%" during stabilisa-
tion time, so the measurement time will start). If nec-
essary the stabilisation time can be terminated with
<F1>
.
6. Once the measurement time is over, the result is
displayed and can be printed with
<Print>
.
7. If the menu
„Sewage“
is selected again, so the
result can be called up with
<F4>
(as long as the
ecom-DP3
is on) or a new measurement can be
started with
<F1>
.
Sewage
Stabilisation time
Res. time: 9:58min
Pressu 153.1hPa -0.8hPa
Temp. 22.6°C 0.3°C
Start Difference
152.3
hPa
Sewage
Measur. in process
Res. time: 9:25min
Pressu 152.3hPa 0.0hPa
Temp. 22.6°C 0.0°C
Start Difference
152.3
hPa
Forward w.:
Sewage
Set value 150hPa
Built up pressure!
140.3
hPa
10min
10min
Sewage
Measurement 10:00min
Ini. Press 152.3hPa
Fin. Press 152.3hPa
Difference 0.0hPa
Ini. temp. 22.6°C
End temp. 22.6°C
Difference
0.0°C
Forward w.:
Sewage
Start new
measurement?
Select:
YES
NO
Summary of Contents for DP3
Page 1: ...Operating Instructions ...