TP-M11
3
IMPORTANT NOTES FOR THE INSTALLER
)
A Quick Check List
!
Are the water connections to the water heater oriented in a way to avoid trapping air in
the heating circuit? (see diagram on next page)
!
Is the purge valve installed on the return line from the air handler upstream from the
isolation valve?
!
Is the air handler hung and isolated to avoid transmitting vibration through framing and
duct work?
!
Are the isolation valves full-port? Restrictive valves will limit performance.
!
Are Thermostat connections correct, including cooling and continuous run connections?
!
Have the packing materials been removed from the blower and the pump ?
!
Is there an installation manual for the home owner ?
!
Is the unit accessible? Are there clearances for service and component replacement?
!
Are the supply plenum and return duct/drop acoustically lined ? (at least 6ft. of the
return duct/drop and the supply plenum are recommended)
!
Is the filter cover in place? Is a clean filter in place? Is the supplied filter rack
installed?