Align the left/right
position of the Skirt
with the outer edge of
the array. Torque
Clamps to 14 ft-lbs.
Check to ensure north
side of Clamp is
positioned to accept
Module.
Torque to: 14 ft-lbs
8. Install Skirts on Downhill Row
8a. Skirt to Lower Clamp Positioning
Skirt must
be installed
in upper
position
8b. Install the First Skirt
Module
40 & 50mm Skirt Position
High Position
Skirts are held in place
by the Clamps and
joined (end-to-end) by
Couplings.
Three Skirt types are
available fitting the
most common Module
frame thickness (see
table). The Skirt type is
stamped on the inside
face of Skirt.
Skirts must be installed
in the correct dovetail
engagement (Skirt-to-
Clamp) to match the
Module in use. Once
installed, the Skirt sets
the Upper Clamp
position matching it to
the Module thickness.
Metric
Inches
(approx)
33mm
1-5/16
35mm
32mm
1-3/8
1-1/2
40mm
50mm
2
1-5/8
55mm
1-11/16
Module Thickness
Skirt must
be installed
in lowest
position
Skirt
Module
Lower
Clamp
Upper
Clamp
32, 33, 35 & 45mm Skirt Position
Low Position
Align and mate
the appropriate
engagements
Tighten Strut Bolts enough
to hold Skirt in position -
leave Clamps open to accept
Modules
Align this edge
with outside
edge of Module
32, 33, 35 & 45mm Skirt Position
14 of 31
EcoX Gen2 Installation Guide, Rev 1.11
Summary of Contents for EcoX
Page 1: ...EcoX Gen2 Installation Guide Rev 1 11 Installation Guide Gen2 ...
Page 31: ...EcoX Gen2 Installation Guide Rev 1 11 26 of 31 11 Grounding and Bonding cont ...
Page 32: ...EcoX Gen2 Installation Guide Rev 1 11 27 of 31 11 Grounding and Bonding cont ...
Page 33: ...EcoX Gen2 Installation Guide Rev 1 11 28 of 31 11 Grounding and Bonding cont ...