1. Snap left/right chalk
lines.
2. Mark the
attachment
locations by locating
the structural
members of the
roof. Refer to the
EcoX Calculator for
maximum allowable
span and cantilever.
Ensure that
attachment
locations meet and do
not exceed, the EcoX
design specifications on
allowable spans and
cantilever distances.
When marking the
attachment
locations, make the
downhill leg of the mark
long enough to be
visible from the downhill
edge of the Flashing
when the Flashing is in
its installed position.
This mark will accelerate
the Flashing installation
by quick alignment of
the Flashing to the mark.
1b. Snapping Chalk Lines and Marking Attachment Locations
Corners
of Array
Make these
marks
extra long
downhill.
See
Roof Structural Members
Attachment Locations
1. Layout Array on Rooftop (cont.)
Cantilever
Span
5 of 31
EcoX Gen2 Installation Guide, Rev 1.11
Summary of Contents for EcoX
Page 1: ...EcoX Gen2 Installation Guide Rev 1 11 Installation Guide Gen2 ...
Page 31: ...EcoX Gen2 Installation Guide Rev 1 11 26 of 31 11 Grounding and Bonding cont ...
Page 32: ...EcoX Gen2 Installation Guide Rev 1 11 27 of 31 11 Grounding and Bonding cont ...
Page 33: ...EcoX Gen2 Installation Guide Rev 1 11 28 of 31 11 Grounding and Bonding cont ...