
PowerSpout
React Pump Installation
© 2019 EcoInnovation Ltd (NZ) V2.1
Page 78
Dig holes and position the 4 corner posts as shown
5.2.1.
Posts are 2.1m long, 1.0m in the ground and dry mix concrete rammed to secure in place.
Position trussed frame
5.2.2.
Bolt or use several long tek screws to secure truss at each post location.
The late afternoon shadow confirms the trussed frame is mounted East/West.