![Ecoflam MAX P 35 AB Manual Download Page 14](http://html1.mh-extra.com/html/ecoflam/max-p-35-ab/max-p-35-ab_manual_2354188014.webp)
14
EN
420010334402
Max P 35 / 45 AB
VERIFY:
- That piping system is perfectly sealed.
- That the use of hoses is avoided whenever is possible (use copper pipes
preferably).
- That depression is not greater than 0,45 bar, to avoid pump’s cavitation.
- That check valve is suitably designed for the duty.
The pump pressure is set at a value of 12 bar during the testing of burners.
Before starting the burner, bleed the air in the pump through the gauge port. Fill the piping with light-oil to facilitate
the pump priming. Start the burner and check the pump feeding pressure. In case the pump priming does not take
place during the first prepurging, with a consequent, subsequent lock-out of the burner, rearm the burner’s lock-out to
restart, by pushing the button on the control box. If, after a successful pump priming, the burner locks-out after the
prepurging, due to a fuel pressure drop in the pump, rearm the burner’s lock-out to restart the burner. Do never allow
the pump working without oil for more than three minutes. Note: before starting the burner, check that the return
pipe is open. An eventual obstruction could damage the pump sealing device.
HYDRAULIC CIRCUIT
V2
V1
4
5
1 - HOSE
2 - OIL FILTER
3 - OIL COCK
4 - SUCTION
5 - RETURN
1
1
2
3
PRIMING AND ADJUSTMENT OF OIL PUMP
SUNTEC
SUNTEC
SUNTEC
SUNTEC
6
5
4
3
3
3
SUNTEC
SUNTEC
P
V
2
1
SUNTEC AS 67 B
1 - INLET
2 - RETURN
3 - BLEED AND PRESSURE GAUGE PORT
4 - VACUUM GAUGE PORT
5 - PRESSURE ADJUSTMENT
6 - TO NOZZLE
Summary of Contents for MAX P 35 AB
Page 9: ...9 IT 420010334402 Max P 35 45 AB 7 7 8 9 10 SMONTAGGIO TESTA 1 2 3 4 5 6...
Page 18: ...18 EN 420010334402 Max P 35 45 AB 7 7 8 9 10 REMOVING FIRING HEAD 1 2 3 4 5 6...
Page 27: ...27 FR 420010334402 Max P 35 45 AB 7 7 8 9 10 DEMONTAGE TETE DE COMBUSTION 1 2 3 4 5 6...
Page 36: ...36 ES 420010334402 Max P 35 45 AB 7 7 8 9 10 DESMONTAJE CABEZA DE COMBUSTION 1 2 3 4 5 6...
Page 43: ...43 RU 420010334402 Max P 35 45 AB LED tw tw AL LED 10 2 TSA 3 4 5 6 7 8 5 9 10 off 3...
Page 45: ...45 RU 420010334402 Max P 35 45 AB 7 7 8 9 10 1 2 3 4 5 6...
Page 46: ...46 RU 420010334402 Max P 35 45 AB 3 2 0 I 4 1 0 2 2 2 2...
Page 54: ...54 DE 420010334402 Max P 35 45 AB 7 7 8 9 10 Ausbau des Mischkopfes 1 2 3 4 5 6...
Page 56: ...56 IT EN FR ES RU 420010334402 Max P 35 45 AB DE...
Page 57: ...57 IT EN FR ES RU 420010334402 Max P 35 45 AB DE...
Page 62: ...420010334402 Max P 35 45 AB RU ES FR EN IT 62 DE...
Page 63: ...420010334402 Max P 35 45 AB RU ES FR EN IT 63 DE...