The (first) valve operating mechanism is now synchronised to the new
security code. ‘CodE SynC 001’ appears on the heating control’s LCD.
Repeat the following 6 steps (see next page) for each installed valve
operating mechanism:
1.
Remove the battery compartment cover of the (first) valve operating
mechanism by sliding it down and out.
2. Press the button on the valve operating mechanism for approx.3 seconds
until you hear 3 signal tones. The valve operating mechanism is now ready
to receive and ‘AC’ is displayed.
3. Press the ‘PROG’ button on the heating control to start transmitting the
heating control’s security code to the valve operating mechanism.
4. The valve operating mechanism acknowledges that it has received the
code correctly with a tone sequence.
5. Replace the valve operating mechanism’s battery compartment cover.
6.Thevalveoperatingmechanismacknowledgesthatithasreceivedthefirstnorm
alradio signal with a signal tone.
Repeat these 6 steps for all the other valve operating mechanisms that are
located in the room (‘002’, ‘003’ ... on the display) according to the number of
valve operating mechanisms that has been set.
Once all the valve operating mechanisms have been coded the heating
control automatically returns to the normal operating mode.
You can skip any valve operating mechanisms that have already been
synchronised / programmed to the heating control’s security code.
All you need to do is briefly press the ‘PROG’ button on the heating control
(do not open the respective valve operating mechanism/do not press the
button on the valve operating mechanism!)
9.6.
Synchronising the valve operating mechanisms (‘SYnC’)
When this menu item is selected, the heating control starts to signal (for
approx. 2 minutes) to all the valve operating mechanisms that they should re-
synchronise.
27