Chapter II Page 3
1.
Dissolve of 30/40 grams of chemical protector (sodium metabisulfite) with the 5 liters
of water you set aside in a different container set the auxiliary valve (18) on aspiration
so that it can absorve the solution.
2.
Close the Seacock Valve (1), Start up the system by pressing “PRODUCTION”, and
just before the chemical protector and water solution from the tank runs out press
“STOP”. This means the entire circuit will contain this protecting solution.
Do not forget to shut off the seacock valve (1) as a security measure.
3.
When the unit is ready to be turned on once again, the valve (1) must set to the open
position and the valve (11) to the
“PRUEBA/TEST”
position so that the water produced
initially is rejected. Proceed as described in
I.6FIRST START-UP
(Chapter I Page 10).
Warning: sodium metabisulfite is a caustic product that may cause serious irritation to
the skin and mucus membranes. Take due precautions before handling, do not touch it
directly and always work in well-ventilated spaces.
Summary of Contents for WATER-PRO MODULAR B-60
Page 4: ...CHAPTER I INTALLATION OPERATION AND MAINTENANCE ...
Page 14: ...CHAPTER II STORAGE AND CLEANING ...
Page 19: ...CHAPTER III PARTS LISTING EXPLODED VIEW OF THE ST 15 CERAMIC ECO SISTEMS PUMP ...
Page 23: ...CHAPTER IV FILTERS AND MEMBRANE REPLACEMENT ...
Page 26: ... F L O W E N T R A D A S A L I D A 1 2 3 7 M A X 9 3 5 m m Chapter IV Page 3 ...