Eco Air ECO906SQ Installation Manual Download Page 13

10

ELECTRICAL  WORK

Test running

Perform  test operation after completing gas leak check at the pipe connections and 
electrical safety check.
    Check that all tubing and wiring have been properly connected.
    Check that the coupling connection on the outdoor unit is completely secure and aligned.
1. Connect the power, press the ON/OFF button on the remote controller to turn the unit on.
2. Use the MODE button to select COOL, HEAT, AUTO and FAN to check if all the functions
     works well. 

O

3. When the ambient temperature is too low(lower than 17 C), the unit cannot be tested via 
     the remote controller to run at cooling mode.  
     Carry out a manual testing via a manual control button located in the indoor unit (as 
      illustrated below).  The  remote controller  must be disabled first. 
     To locate the manual control button, open the indoor unit panel by holding the panel 
      sides and lifting  the panel up to an angle until it remains fixed with a clicking sound. 
      Press the Manual control button to select  AUTO or COOL, this will force the operation 
      of AUTO or COOL(see User Manual for details).
4.  The test operation may last about 30 minutes.

Model

Power supply

Input Rated Amp
(Switch/Fuse)

<16000Btu/h

NOTE: The supply voltage can not be less than the rate voltage of the air conditioner.

220-240V~ 50Hz

13A

>16000Btu/h

220-230V~ 60Hz

20A

or

1) Be sure to use a dedicated power circuit specifically for the air conditioner. 
2) The screws fastening the wiring in the casing of electrical fittings may become

loose from vibrations and transportation.  Tighten all terminal screws securely.
Check and make sure they are tightly 

3) Check the specification of power source is correct.

4) Confirm that electrical capacity is sufficient.
5) Make sure the starting voltage is maintained at more than 90 percent of the rated

voltage marked on the name plate.

6) Always install an earth leakage circuit breaker in a wet or moist area.

7) A vibration of a magnetic switch may damage the contact point, causing fuse
    break to fail or the normal function of an overload to fail.
8) Do not turn on the safety breaker until all work is completed.

 

9) Use an all-pole disconnection type breaker with at least 3mm between the contact 

point gaps.

CAUTION

CAUTION

CAUTION

After the confirmation of the above conditions, prepare the wiring as follows:

Manual control 

button

AUTO/COOL

Summary of Contents for ECO906SQ

Page 1: ...Before using your air conditioner please read this manual carefully and keep it for future reference R410A SPLIT SERIES DC INVERTER QUICK COUPLING Models ECO906SQ ECO1206SQ ECO1806SQ...

Page 2: ...ust be connected to the terminal which is marked with the letter N or coloured BLACK The BROWN wire is the LIVE and must be connected to the terminal which is marked with the letter L or coloured RED...

Page 3: ...ke back the old appliance for disposal when you replace with a new product C Old products contain valuable resources which should be recycled as scrap metal Wild disposal of waste in forests and lands...

Page 4: ...nsure that they do not play with the air conditioner If the power cord is to be replaced replacement work shall be performed by authorised personnel only Installation work must be performed in accorda...

Page 5: ...se electrical shock or fire 6 Use the specified cables for electrical connections between indoor and outdoor units Firmly clamp the cables so that no external stress is placed on the terminal Incorrec...

Page 6: ...e free from the possibility of flammable gas leakage in a nearby place Avoid places near a bedroom and the like so that the noise will not be an annoyance Ensure any local authority permission is soug...

Page 7: ...loor Two of the A B and C directions should be free from obstructions CAUTION Self tapping screw B ST2 9x10 C H Remote controller holder 7 8 12cm above Air Filter 12cm above 15cm above 1 2 3 Remote Co...

Page 8: ...nd corresponding mounting points on the installation plate Dimensions are in mm unless otherwise stated 1 Determine hole positions according to the diagram detailed in Fig 5 Drill one 1 hole 90mm slan...

Page 9: ...on 3 Drainage Installation 1 Run the drain hose sloping downward to ensure condensation water is being drained externally any rise in the drain hose will prevent condensation water to flow externally...

Page 10: ...erly by putting the unit lengthwise along the wall or using a dust or shield plates In coastal or windy area install the unit to prevent the exposure to strong winds If mounting on wall brackets the i...

Page 11: ...that the handle on the male coup ling is in a reclined positio n away from the mating male coupling Step 2 Retract the Release Sleeve on female coupling insert the male coupling located on the indoor...

Page 12: ...ion Step 4 Retract the Release Sleeve on the female coupling to release the male coupling half from the female half Step 5 To seal and protect from dust reinstall the protective cap and plug Electrica...

Page 13: ...or details 4 The test operation may last about 30 minutes Model Power supply Input Rated Amp Switch Fuse 16000Btu h NOTE The supply voltage can not be less than the rate voltage of the air conditioner...

Page 14: ...MEMO Date of installation Purchased from Dealer Name Date of purchase Model number Serial number...

Page 15: ...ing from a faulty installation is specifically excluded This unit must be operated under conditions as recommended at voltages indicated on the unit Any attempts made to service or modify the unit by...

Reviews: