![Eclipse Algas-SDI P120 Operation & Maintenance Manual Download Page 42](http://html.mh-extra.com/html/eclipse/algas-sdi-p120/algas-sdi-p120_operation-and-maintenance-manual_533936042.webp)
Troubleshooting
Algas-SDI Operations & Maintenance Manual P/N 52632
6-43
Remove the red wire from P11 and the red wire from the fuse block. Check for
proper resistance as indicated.
If this test is bad, repair the wiring. If this test is good, reconnect the wiring and
retest the vaporizer. If the display shows #5 again, replace the control board.
See the Electrical Drawing that came with your unit for other solenoid
wiring configuration.
Figure 20 - Solenoid Valve Electrical Check (B)
Solenoid Electric Check (B).dxf
OHM