9
Installation Guide
9
tel - 1-800-477-2267
email - [email protected]
Illustrations are typical and may not match exact vehicle detail
Step 4
Route the LVDS cable behind the plastic sub dash on the
right side. Route the Power and Camera harnesses behind
the plastic sub dash on the left side.
Step 6
Insert the supplied zip tie behind the sub dash center
support. Be sure to leave the ends of the zip tie in front of the
supports to the left and right.
Step 5
Connect the Power, Camera and LVDS harnesses to the
FC-MBS control module.
FCTP-MB1903
Sprinter Tow Package