Page 2 of 4
Mounting:
SCREWS
BEZEL
LIGHTHEAD
VHB Adhesive
Wire:
RED: Positive, Colors 1 (need to add 5A fuse)
WHITE: Positive, Colors 2 (need to add 5A fuse)
BLACK: Negative
BLUE: Pattern select to negative
YELLOW: Synchronized Function
(Up to 8 units can be Synchronized)
Phase Operation:
Phase 1 (Ph1) flashes simultaneously with Ph1
Phase 2 (Ph2) flashes simultaneously with Ph2
Ph1 alternates with Ph2
(Up to 8 units can be Synchronized)
Apply BLUE TO BLACK wire:
-Less than 1 sec. for next pattern
-Between 1-3 sec for previous pattern
-Between 3-5 sec. for factory default
-More than 5 sec. for steady burn
Operation Environment:
Ambient Temperature:
-30 to 50°C (-22
°
F to 122
°
F
Mounting on a curved surface:
1. Mark hole location using gasket as a template and drill hole for wire
exit using 11/32 in. drill bit.
2. Wipe surface clean with alcohol wipe. Wait until dry.
3. Mount light using VHB adhesive. Peel adhesive backing and apply
pressure to adhere to surface for 20 seconds. It is recommended
to allow 24 hours for adhesive to fully adhere before powering on
light.
* Do not use hardware, gasket or bezel when mounting on
curved surface.
* Max surface curvature 120°.
Mounting on flat surface:
1. Mark wire and screw locations using gasket as a template. Drill
wire exit hole using 11/32 in. drill bit. Pre-drill screw holes using
3/64 in. drill bit.
2. Peel VHB backing and apply light to surface, aligning screw holes
and wire exit. Apply pressure for 20 seconds. Insert screws
through bezel to finish mounting lighthead. It is recommended to
allow 24 hours for adhesive to fully adhere before powering on
light.
*For extra adhesion, use 3M Tape Primer. For product & application information, go to: https://multimedia.3m.com/mws/media/65952O/3mtm-tape-primer-94.pdf