background image

Operating instructions

K3G310-BB49-02

Translation of the original operating instructions

4.2.3 Idle current

Because of the EMC filter integrated for compliance with EMC
limits (interference emission and interference immunity), idle
currents in the mains cable can be measured even when the
motor is at a standstill and the mains voltage is switched on.

The values are typically in the range < 250 mA

At the same time, the effective power in this operating state
(operational readiness) is typically < 5 W.

4.2.4 Residual current operated device

If the use of a residual current device (RCD) is required in your
installation, only universal residual current devices (type B or
B+) are permissible. Residual current devices (RCD) cannot
provide personal safety while operating the device, as is also
the case with frequency converters. When the device power
supply is switched on, charging current pulses from the
capacitors in the integrated EMC filter can lead to the instant
triggering of residual current devices. We recommend residual
current circuit breakers (RCCB) with an activation threshold of
300 mA and delayed tripping (super-resistant, characteristic K).

4.2.5 Leakage current

For asymmetrical power systems or if a phase fails, the
leakage current can increase to a multiple of the nominal value.

4.2.6 Locked-rotor protection

Due to the locked-rotor protection, the start-up current (LRA) is
equal to or less than the nominal current (FLA).

4.3 Connection in terminal box

4.3.1 Preparing connection lines for the connection

Strip the cable just enough so that the screwed cable gland is tight and
the terminals are relieved of strain. Tightening torque, see chapter 3.1
Product drawing.

NOTE
Tightness and strain relief depend on the cable used.

→ The user must check this.

Fig. 2: Recommended stripping lengths in mm (inside the terminal box)
Legend: CL = control lines

4.3.2 Connecting cables with terminals

WARNING
Terminals and connections have voltage even with a
unit that is shut off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the screwed cable gland.

Remove the cap only in those places where cables are inserted.

;

Mount the screwed cable glands with the seal inserts provided in the
terminal box.

;

Insert the line(s) (not included in the standard scope of delivery) into
the terminal box.

;

First connect the "PE" (protective earth) connection.

;

Connect the lines to the corresponding terminals.

Use a screwdriver to do so.
During the connection work, ensure that no cables splice off.

Fig. 3: Connecting the wires to terminals

;

Seal the terminal box.

Item no. 51232-5-9970 · ENG · Revision 210976 · Release 2020-03-27 · Page 8 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for K3G310-BB49-02

Page 1: ...ry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re evaluated once it is install...

Page 2: ...Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill DANGER Flying parts Missing safety devices may cause balancing weights...

Page 3: ...r 3 2 Nominal data Operating the device with all protective features in place Minding the operating instructions Improper use Using the device in the following ways is particularly prohibited and may...

Page 4: ...meter min 4 mm max 10 mm tightening torque 4 0 6 Nm 3 Tightening torque 3 5 0 5 Nm 4 Mounting position shaft horizontal install the support struts only vertically as shown in the view or rotor on bott...

Page 5: ...data is determined using a motor impeller combination in a standardised measurement configuration 3 4 Technical features Mass 22 1 kg Size 310 mm Motor size 112 Surface of rotor Coated in black Mater...

Page 6: ...ty of the installation engineer or operator owner of the device to ensure if necessary after consultation with the network operator that this device is only connected to a connection point with a Ssc...

Page 7: ...nto leads or wires Water enters at the cable end on the customers side and can damage the device Make sure that the cable end is connected in a dry environment Connect the device only to circuits that...

Page 8: ...protection Due to the locked rotor protection the start up current LRA is equal to or less than the nominal current FLA 4 3 Connection in terminal box 4 3 1 Preparing connection lines for the connect...

Page 9: ...ip edge can be produced by fitting a cable tie directly in front of the cable gland for example 4 4 Factory settings Factory settings with which the device is pre set by ebm papst Control mode paramet...

Page 10: ...pin or applied voltage 5 50 VDC disabling bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 VDC SELV KL 3 8 Din2 Digital input 2 parameter set sw...

Page 11: ...nce frequencies that may be present When regulating the speed pass through resonance ranges as quickly as possible or find another remedy Operation at excessive vibration levels can lead to premature...

Page 12: ...remove them afterwards Motor does not turn Mechanical blockage Switch off de energise and remove mechanical blockage Mains supply voltage faulty Check mains supply voltage restore power supply Importa...

Page 13: ...ingressed If cleaning does not eliminate vibration the fan may have to be re balanced In such cases please contact ebm papst The fan is provided with maintenance free ball bearings The lifetime lubri...

Page 14: ...ts could drop off during disassembly This can result in fatal or serious injury and material damage Secure components before unfastening to stop them falling 6 4 3 Component disposal The products are...

Reviews: