
32
rev. 01/21
PUMP START-UP REPORT
WARRANTY VOID IF NOT COMPLETED AND MAILED TO
EBARA INTERNATIONAL CORPORATION WITHIN 30 DAYS OF START-UP
Date: ________________________________ Job Name: ______________________________
Contractor: ____________________________ Signature: ______________________________
Design Conditions: ______________________ GPM @: ______________________________TDH
please
VHOHFW
voltage below:
AB
AC
BC
Pump Model: ____________________ HP: ______ Voltage:
208/230
460
_____ _____ _____
Pump Serial No.: #1 __________________ #2 __________________ #3__________________
Control Manufacture: ____________________ Heater Size: ____________________________
GRD Connected: ________________________ Alternator Tested__________________________
Megger Check:
#1________ Red ________
White ________
Black________
#2________ Red ________
White ________
Black________ { To Ground
#3________ Red ________
White ________
Black________
Resistance Check: #1________ RW ________
RB __________
WB ________
#2________ RW ________
RB __________
WB ________ { Rated ______
#3________ RW ________
RB __________
WB ________
Amperage Check: #1________ A __________
B____________
C __________
#2________ A __________
B____________
C __________ {FL Amps ____
#3________ A __________
B____________
C __________
Performance Test: #1________ GPM@ ____
TDH ________
#2________ GPM@ ____
TDH ________
Water Level ________
#3________ GPM@ ____
TDH ________
Comments ________________________________________________________________________
__________________________________________________________________________________
I certify this report to be accurate (
please sign): ____________________________________________
Official Start Date: ________________________ Report Date: ______________________________
1. Check oil
2. Sensor cable connected
yes
no
3. Check moisture sensor
closed
open
4. Check thermal sensor
closed
open
5. Check rotation
6. Guide Rails
Plumb
Secured
7. Station clean of debris
8. Check valves for proper operation
9. Pump seated properly
10. Check for leaks in piping
11. Flow meter
12. Pressure gauge
13. Ebara Capacitor pack or equivalent (1ø only)
Relay # __________
Start Cap MFD __________
Run Cap MFD __________
Pumps Americas Corporation
Corporate Headquarters
1651 Cedar Line Drive, Rock Hill, South Carolina 29730 USA
㻌
P: (803) 327-5005 F: (803) 327-5097 www.pumpsebara.com