
16
EBARA
PUMPS AMERICAS CORPORATION
www.pumpsebara.com
(t) 803.327.5005 (f) 803.327.5097
rev. 01/21
EBARA Submersible Sewage Pumps
Operating, Installation, and Maintenance
DL3FU / DL3MFU / DL3KFU / DL3KMFU / DDL3FU / DV3FU/ DML3FU
INSTRUCTION MANUAL
P.15
PM32U
Output 40 to 60HP
460V(208/230V not available)
4.2 Grounding (Fig. 11 and Table 3)
Be sure to connect the ground line (labeled
“
G
”
) to ground. Prior to grounding, ensure that the
wire is the proper one (labeled
“
G
”
).
Also, verify that grounding continuity has been established inside the motor by checking that
ground wire (labeled
“
G
”
) is electrically conductive with the bolt on the top of the motor (to be
stripped of paint to bare metal surface).
Ground the motor according to local codes.
Ground terminal
Ground wire
Ground
plate
G.L
Table 3 (Example)
Motor
classification
Grounding
resistance
Minimum Ground
line diameter per
AC 600V below
10
Ω
NEC 70
T2
T3
T6
T4
T1
T5
G
S
R
T
P1
P2
P3
P4
THERMAL PROTECTOR
LEAKAGE DETECTOR
L2
L1
L3
Fig. 11
G - GRN
L1 - RED - T1- T6
L2 - WHT - T2 - T4
L3 - BLK - T3 - T5
P1 - RED
P2 - WHT
P3 - BLK
P4 - ORG