 www.eaton.com

Navigating the HMI screens

Startup screens

The screen shown below is the ZSI test box startup screen. This 

screen should show up each time the test box is powered on. If 

this screen does not show up when the device is powered on, 

contact Eaton customer support. The test program may need to be 

re-loaded.  
These instructions reinforce the need to confirm that the breakers 

being tested have had the correct settings configured as well as the 

correct cable connections made to the ZSI best box.  Please review 

the previous sections of this manual if there are any concerns over 

proper connections.  Once the check box has been selected, the 

“Test Screen” button becomes visible.

Digitrip settings screen

The “Digitrip Settings” button will take you to the Digitrip settings 

screen shown below.  Here, you can select which Digitrip model you 

are testing and find all of the settings required to be enabled on the 

trip units in order to successfully test them using the ZSI test box.

Zone configuration screen

The “Zone Config” button will take you to the zone configuration 

screen which will give you single line representations of the configu-

rations tested based on your selections made regarding lineup 

arrangement and fault location.  (Example shows double ended 

arrangement with a main fault.)

Test sequence screen

The “Test Sequence” button will take you to the test sequence 

screen describing the required test sequence in order to validate 

correct ZSI operation based on the arrangement you have selected 

(Single vs double ended arrangements)

Summary of Contents for ZSI

Page 1: ...TRICAL PERSONNEL SHOULD BE PERMITTED TO WORK ON THE EQUIPMENT m CAUTION SPECIFIC OPERATING PROCEDURES MUST BE DEVELOPED BY THE RESPONSIBLE PARTY DUE THE UNIQUE APPLICATION AND VAST VARIETY OF SYSTEM AND USER REQUIREMENTS FAILURE TO DEVELOP SPECIFIC PROCEDURES COULD LEAD TO IMPROPER USE OR OTHER MORE SERIOUS CONSEQUENCES m CAUTION PLEASE READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE ATTEMPTING TO O...

Page 2: ...ound time 0 3 sec Amp unbalance Off Amp unbalance time 10 sec Phase loss OFF Main PU 10 x In Maintenance mode Disabled Frequency 60 HZ BC relay reset Auto Sliding demand Off Wave form capture Off Rev power sensing Disabled Table 2 Digitrip 520M 520MC settings Parameter Setting Parameter Setting Long delay setting 0 4 Long delay time 6xlr 2 Short delay setting 3 Short delay time Depends on zone Z1 ...

Page 3: ... the power cable into the ZSI test box 5 Plug the power cable into a standard 120V outlet 6 Refer to the Test Sequence screen in the Navigating the HMI Screens section to determine which series of tests need to be performed 7 Refer to the Zone Configurations section to determine the correct cable connections for the desired test 8 Plug a ZSI zone cable into one of the zone plugs on the ZSI test bo...

Page 4: ... the correct zone 13 Move the selector switch on the ZSI test box to the ON posi tion 14 Navigate to the Test Screen on the display panel 15 Select Single or Double based on the switchgear configura tion being tested 16 Select Main Fault Tie Fault or Feeder Fault 17 Press the Initiate Test button to start the test 18 After the test is completed press the Reset Test button to prepare the tester for...

Page 5: ...n the selections made on the HMI Circuit diagrams of these setups can be found in the Zone Config screen subsection of the Navigating the HMI Screens section in this manual Note N For M T T M repeat test for each tie breaker ZSI Test Box Zone 1 Zone 2 Zone 3 Main1 Digitrip Tie Digitrip Main2 Feeder Digitrip Configuration 1 Main Tie Main Configuration 1 Arrangement double Main fault This simulates ...

Page 6: ...iguration 2 Main Tie Main Configuration 2 Arrangement double Main fault This simulates a fault originating between the M2 main 2 breaker and the tie breaker Tie fault This simulates a fault originating downstream of the M2 main 2 breaker and tie breaker Feeder fault This simulates a fault originating on the load side of a feeder on the main 1 bus main 1 feeder This fault would flow through main 2 ...

Page 7: ...Main fault This simulates a fault originating on the load side of the main 1 breaker Feeder fault This simulates a fault originating on the load side of the main 1 feeder breaker ZSI Test Box Zone 1 Zone 2 Zone 3 Main2 Digitrip Main2 Feeder Digitrip Configuration 4 Main2 Main2 Feeder Configuration 4 Arrangement single Main fault This simulates a fault originating on the load side of the main 2 bre...

Page 8: ...double main opposite feeder Simultaneous main fault This simulates simultaneous faults One originates on the load side of the main 1 breaker before the tie and the other originates on the load side of the main 2 feeder ZSI Test Box Zone 1 Zone 2 Zone 3 Main2 Digitrip Main1 Feeder Digitrip Configuration 6 Simultaneous Main Fault Main1 Digitrip Configuration 6 Arrangement double main opposite feeder...

Page 9: ...ections Once the check box has been selected the Test Screen button becomes visible Digitrip settings screen The Digitrip Settings button will take you to the Digitrip settings screen shown below Here you can select which Digitrip model you are testing and find all of the settings required to be enabled on the trip units in order to successfully test them using the ZSI test box Zone configuration ...

Page 10: ...see 5 5 This area of the screen is where buttons are that allow a user to change the arrangement of the switchgear lineup being tested 6 After a test is performed this area displays a timer that is relative and useful when troubleshooting any issues related to the wiring of the test box These are not true trip times but can be used to determine ZSI functionality 7 This is the area where the test r...

Page 11: ...p plugs are installed in correct breakers Single double feeder tie Z1 tripped during Z2 test Check trip unit settings and ZSI configuration map to ensure trip plugs are installed in correct breakers Double tie Z3 tripped during Z2 test Check trip unit settings and ZSI configuration map to ensure trip plugs are installed in correct breakers Z3 error messages Double feeder fault Z3 trippped too slow...

Page 12: ...______________________________ Ground time 0 4 ________________________________________ Arc flash reduction off __________________________________ Arc flash reduction setting R5 ___________________________ Long delay time 6xlr 2 ________________________________ Breaker Name _______ Breaker Position ________ Setting required for testing Original setting Setting required for testing Original setting...

Page 13: ...__________________ Inst PU 4 x ln ___________________________________________ Wave form capture off __________________________________ Gnd PU 0 3 ____________________________________________ Rev power sensing disabled _____________________________ Breaker name __________ Breaker position ___________ Setting required for testing Original setting Setting required for testing Original setting Curve t...

Page 14: ...ractual agreement between Eaton and the purchaser THERE ARE NO UNDERSTANDINGS AGREEMENTS WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY...

Reviews: