8
XSTORAGE HOME USER INTERFACE MANUAL
July 2019 www.eaton.com
As an Eaton certified installer, you need to configure the topology of the installation at the end user’s home in order to finalize the
commissioning process. You can find the details of this procedure in the xStorage Home installation manual and power meters
manual available on eaton.com/xstorage. Depending on the installation at the end user’s home, you may need to configure the
following:
•
Power meter 1. Please select the meter from the drop-down menu;
•
Power meter 2. Please select the meter from the drop-down menu;
•
Photovoltaic panels.
In the example shown in Figure 6, the power meter Sfere DDS1946-DS is set at both Power meter 1 and Power meter 2 and
photovoltaic panels are installed and connected to xStorage Home.
3.4 Step 3: Topology
Figure 6: Example of a topology configuration with xStorage Home
For the power meter Eastron SDM 120CT-Modbus, the procedure starts from Power meter 2 as indicated in the xStorage Home
Power Meters manual that you can download on
eaton.com/xstorage
.