background image

iii

Xenon beacon XB4

English

Xenon beacon Xb4

   TM148.H   May 2022   www.eaton.com

Contents

1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . 1

2.0 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

General   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Cable termination   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Access to terminals – Exd units: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Access to terminals - Ex de units: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

3.0 OPERATION  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1

4.0 MAINTENANCE  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Removing/replacing Xenon tube  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

5.0 CERTIFICATION/APPROVALS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

IECEx units   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
ATEX units  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

6.0 SPECIAL CONDITIONS FOR SAFE USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3

And additionally for the Ex de versions of the beacons:-  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Summary of Contents for XB4

Page 1: ...Xenon beacon XB4 Technical manual...

Page 2: ...URPOSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL...

Page 3: ...ON 1 General 1 Cable termination 1 Access to terminals Exd units 1 Access to terminals Ex de units 1 3 0 OPERATION 1 4 0 MAINTENANCE 2 Removing replacing Xenon tube 2 5 0 CERTIFICATION APPROVALS 2 IEC...

Page 4: ...iv Xenon beacon XB4 TM148 H May 2022 www eaton com...

Page 5: ...and integrated with the unit such that this rating is maintained The internal earth terminal where fitted must be used for the equipment grounding connection and the external terminal is for a supplem...

Page 6: ...ame time Unscrew the 3 off M8 screws 6 0mm A F hexagon key holding the cover assembly to the base The cover screws are captive and will be retained in the cover assembly Twist the cover assembly gentl...

Page 7: ...nd AC to EN61000 6 2 2005 IEC61000 4 5 1995 A1 2000 Conducted Immunity 10V to EN61000 6 2 2005 IEC61000 4 6 2005 A1 2004 A2 2006 Dips and Interruptions AC to EN61000 6 2 2005 IEC61000 4 11 2004 Conduc...

Page 8: ...s 5 Connexion des c bles 5 Acc s aux bornes unit s Exd 5 Acc s aux bornes unit s Ex de 5 3 0 FONCTIONNEMENT 5 4 0 MAINTENANCE 6 Remplacement du tube au x non 6 5 0 CERTIFICATIONS HOMOLOGATIONS 6 Unit...

Page 9: ...un indice NEMA IP quivalent celui du feu et tre int gr s l unit de fa on assurer le maintien de sa classification La borne interne de mise la terre doit tre utilis e pour mettre l quipement la terre L...

Page 10: ...e v rifiez que l unit est hors circuit Remarque Les feux de ce type contiennent deux tubes au x non Il est recommand de remplacer ces deux tubes concomitamment D vissez les trois vis M8 cl Allen 6 mm...

Page 11: ...ectriques rapides salves CC et CA EN61000 6 2 2005 IEC61000 4 4 2004 Immunit aux ondes de chocs CC et CA EN61000 6 2 2005 IEC61000 4 5 1995 A1 2000 Immunit aux perturbations conduites 10V EN61000 6 2...

Page 12: ...en 9 Zugriff auf klemmen Exd einheiten 9 Zugang zu den klemmen Ex de einheiten 9 3 0 BETRIEB 9 4 0 WARTUNG 10 Entfernen austauschen der Xenon r hre 10 5 0 ZERTIFIZIERUNG GENEHMIGUNGEN 10 IECEx Einheit...

Page 13: ...die Einheit integriert ist sodass diese Einstufung erhalten bleibt Die interne Erdungsklemme sofern vorhanden muss f r den Erdungsanschluss der Komponente verwendet werden Die externe Klemme ist f r...

Page 14: ...isoliert ist Hinweis Die Blinklichter enthalten zwei separate Xenon R hren die gleichzeitig ausgetauscht werden m ssen L sen Sie die drei M8 Schrauben 6 0 mm A F Sechskantschl ssel mit der die Abdeck...

Page 15: ...en Bursts DC und AC gem EN61000 6 2 2005 IEC61000 4 4 2004 berspannungsimmunit t DC und AC gem EN61000 6 2 2005 IEC61000 4 5 1995 A1 2000 Weiterleitungsimmunit t 10 V gem EN61000 6 2 2005 IEC61000 4 6...

Page 16: ...o the products to the information contained in this document and to prices are reserved so are errors and omissions Only order confirmations and technical documentation by Eaton is binding Photos and...

Reviews: