![Eaton VCPW-HD Instruction Booklet Download Page 19](http://html.mh-extra.com/html/eaton/vcpw-hd/vcpw-hd_instruction-booklet_525781019.webp)
19
Instruction Booklet
IB131024EN
Effective November 2017
38 kV Type VCPW-HD Simple Electrical
Ground & Test Device (SEG&TD) lower
terminal instruction booklet
EATON
www.eaton.com
Appendix A: Quick "Key" location reference
KK # 1
KK # 2
KK # 3
KK # 4
KK # 5
Factory
/Initial
setting
KU
KB
KC
No Key
KD
No Key
OFF
Confirm SEG&TD represents
(Figure 2)
"PowerGrounding
configuration
" (with grounding
bus connected)
SEG&TD is in the factory or initial
setting, OPEN and outside cell.
Procedure-1
Final state
No Key
KU
KB
KC
KD
No Key
OFF
Procedure-2
Final state
KU
KB
KC
No key
KD
No Key
OFF
Procedure-3
Final state
KU
KB
KC
No key
KB
No Key
CLOSE
Procedure-4
Final state
KD
KU
KC
No Key
KB
No Key
CLOSE
Procedure-5
Final state
KB
KU
KC
No Key
KD
No Key
OPEN
Procedure-6
Final state
No Key
KU
KB
KC
KD
No Key
OFF
Procedure-7
Final state
No Key
KU
KB
KC
KD
No Key
OFF
Procedure-8
Final state
KU
KB
KC
No Key
KD
No Key
CLOSE
Procedure-9
Final state
No Key
KU
KC
No Key
KB
KD
OFF
Procedure-10
Final state
KU
KB
KC
No Key
KD
No Key
OPEN
Procedure-11
Final state
KU
KB
KC
No key
KD
No Key
CLOSE
****
Final state
No Key
KU
KB
KC
KD
No Key
OFF
Appendix A: 38kV HD SEG&TD (LOWER) Operations
(Quick “Key” Location Reference )
Operation
STEPS
Key Outside
SEG&TD
(utility box)
Key captured in
Selector
Switch
Additional Action
SEG&TD Final status
Ra
ck
ing
out
the Lower
SEG
&T
D v
er
sion
&
inse
rti
ng
Te
st p
robes
into Soc
ke
ts
Rem
ovi
ng the te
st
pr
obes
1) Move keys as shown on left.
2) Rack SEG&TD Operation
SEG&TD is OPEN and at CONNECT
position.
1) Move keys as shown on left.
SEG&TD is OPEN and at CONNECT
position.
1) Move keys as shown on left.
2) Plug in the remote operator and
press "CLOSE".
SEG&TD is CLOSE and at CONNECT
position.
Gr
oun
ding O
utgoing ba
sba
rs
1) Move keys as shown on left.
SEG&TD is CLOSE and at CONNECT
position. This has electrically and
mechanically locked the SEG&TD into
CLOSE condition.
SEG&TD is OPEN and at CONNECT
position.
1) Move keys as shown on left.
2) Plug in the remote operator and
press "OPEN".
1) Move keys as shown on left.
2) Rack out SEG&TD to TEST.
3) Pull SEG&TD out of the cell.
4) Convert SEG&TD to "
Probing
configuration
".
SEG&TD is OPEN, outside the breaker
cell and in the "Probing configuratrion".
1) Push the SEG&TD to TEST
position in the "probing
configuration".
2) Prepare for inserting probes.
Racking Operation - Either from "Test" to "Connect" for Power Grounding or from
"Connect" to "Test" for Un-Grounding.
SEG&TD is OPEN, at TEST position and in
the "Probing configuratrion".
1) Move keys as shown on left.
2) Plug in the remote operator and
press "CLOSE".
SEG&TD is CLOSED and at CONNECT
position. Probes mounted and locked in
the socket. Voltage can be probed.
Follow Procedure 11 to 7 in
reverse manner.
SEG&TD is OPEN, at TEST position and in
the "Probing configuratrion".
1) Move keys as shown on left.
2) Plug in the remote operator and
press "CLOSE".
SEG&TD is CLOSED, and at TEST position
1) Move keys as shown on left.
2) Insert the probes.
SEG&TD is CLOSED, and at TEST position
and probes inserted.
SEG&TD is OPEN and at CONNECT
position and probes inserted. (Probes
can not be removed at this stage)
1) Move keys as shown on left.
2) Plug in the remote operator and
press "OPEN".
3) Rack SEG&TD towards
CONNECT position.
(a)
(b)
(c)
(a)
(b)
(c)
(a)
(a)
(a)
(a)
(c)
(b)
(d)
(a)
(b)
(c)
(a)
(b)
(c)
(d)
(d)
(a)
(b)
(c)
(a)
(b)
(d)
(c)