Enterprise Power Solutions Installation and Operation Guide
54
Copyright © 2008 Eaton Corporation. All Rights Reserved.
IPN 997-00012-56C September 2008
"
EPS2 or EPS5
#
Battery cable connected from BATT1 to
first battery module in group 1
$
Battery cable connected from BATT2 to
first battery module in group 2
%
Group 2 battery modules (connected
together)
!
Group 1 battery modules (connected
together)
&
Connector for next battery module, if
required (maximum 5 per group, 10 total)
Step 6 - Switch on battery circuit breaker
The batteries will charge to 90% capacity in approximately 3 hours. However,
it is recommended that they are charged for 24 hours after long-term storage.
Step 7 - Adjust battery capacity in configuration file (if required)
•
In the SC200 or SC100 configuration file, set the battery capacity according to
the number of battery modules connected:
•
Either:
On SC100 go to:
Menu > Configuration > System > Edit > Battery Capacity
>Edit
, or
On SC200 go to:
Battery > Battery > Battery Capacity
.
•
Set
Battery Capacity
to the number of battery modules x 18Ah.
Procedure Complete