O & M Manual for the RLC1

Automatic Transfer Switch

SECTION 5: FUNCTIONAL TESTING

 

  

5.1  Preliminary Checks

Step 1: 

Check all loads connected to the ATS to ensure that they 

are ready to be energized.

5.2  Energize the Switch

Step 1: 

Close the upstream utility power source breaker or switch 

to connect the ATS to the utility power source voltage.

Step 2: 

If the ATS unit is not already in the UTILITY position, the 

solenoid will engage and the contactor will automatically 

switch to the UTILITY position.

Step 3: 

Using a voltmeter, measure the line-to-line and the line-to-

neutral voltages across the utility line terminals to ensure 

the utility voltage is correct.

Step 4:

 Position the generator control selector switch, located on 

the standby generator, to the AUTOSTART position.  (It 

may also be labeled REMOTE START.)

Step 5:

 Close the upstream generator power source breaker or 

switch to connect the ATS to the generator power supply 

source.

5.3  Operational Checks

Step 1:  

Open the upstream utility breaker 

originally closed in Step 1 of Section 5.2.

 

Step 2:  

After a time delay, the standby generator engine will 

start.

Step 3:  

The ATS Time Delay Normal (Utility) to Emergency (Gen-

erator) (TDNE) will begin to time after the generator 

engine begins to run.  After time out, the solenoid will 

engage and the contactor will automatically switch from 

the UTILITY to the GENERATOR position.

Step 4:  

Using a voltmeter, measure the line-to-line and line-to-

neutral voltages across the generator line terminals to 

ensure that the generator emergency voltage is correct.  

If necessary, make adjustments to the voltage regulator 

on the generator according to the manufacturer’s recom-

mendations to correct any voltage deviations.  The ATS 

will only respond to the correct voltage from the genera-

tor power source.

Step 5:  

Close the utility breaker described in Step 1 of 

Section 5.2.

Step 6:  

The ATS Time Delay Emergency (Generator) to Normal 

(Utility) (TDEN) timer will begin timing, and the solenoid 

will engage and automatically switch from the GENERA-

TOR to the UTILITY position and the generator will shut 

down.

5.4 Manual Operation

WARNING

YOU ARE READY TO ENERGIZE THE EQUIPMENT.  VOLTAGES 

WITHIN THE ENCLOSURE ARE CAPABLE OF CAUSING SEVERE PER-

SONAL INJURY OR DEATH.  USE EXTREME CAUTION TO AVOID 

CONTACT WITH ENERGIZED EQUIPMENT.

WARNING

CONTACT WITH ENERGIZED COMPONENTS WILL CAUSE ELECTRI-

CAL SHOCK CAPABLE OF PRODUCING SEVERE PERSONAL INJURY 

OR DEATH.  USE EXTREME CAUTION TO AVOID CONTACT WITH 

ENERGIZED COMPONENTS WHEN USING A METER FOR VOLTAGE 

CHECKS.

 

NOTICE

THIS WILL SIMULATE AN INTERRUPTION OF THE UTILITY POWER 

SOURCE.

  

WARNING

DO NOT ATTEMPT TO MANUALLY OPERATE THE ATS WITH THE 

UTILITY OR GENERATOR AVAILABLE.

  

WARNING

HIGH VOLTAGES ARE PRESENT IN AND AROUND TRANSFER 

SWITCH EQUIPMENT. BEFORE ATTEMPTING TO MANUALLY 

TRANSFER, DISCONNECT THE LINE POWER FROM THE EQUIPMENT 

BEING SERVICED BY OPENING AND LOCKING OUT, IF POSSIBLE, 

THE NEXT HIGHEST DISCONNECT DEVICE. FAILURE TO FOLLOW 

THIS PROCEDURE COULD CAUSE SEVERE PERSONAL INJURY AND/

OR DEATH.

ALWAYS TURN THE UTILITY POWER OFF AND TURN THE GENERA-

TOR (IF A GENERATOR) CONTROL SELECTOR SWITCH TO THE 

“OFF” POSITION BEFORE ATTEMPTING A MANUAL TRANSFER.

Summary of Contents for RLC1

Page 1: ...r the RLC1 Automatic Transfer Switch Instructional Booklet Description Page 1 Introduction 2 2 Receiving Handling and Storage 6 3 Equipment Description 6 4 Installation and Wiring 9 5 Functional Testi...

Page 2: ...r claims against the purchaser or user by its cus tomers resulting from the use of the information and descriptions contained herein 1 1 2 Safety Precautions All safety codes standards and or regulati...

Page 3: ...avail able the ATS remains connected to the generator power source ATSs automatically perform the transfer function and include three basic elements 1 Main contacts to connect and disconnect the load...

Page 4: ...rrent rating of this equipment is 100A and applicable at 240 Vac 60 Hz The ATS equipment is enclosed in a NEMA 3R enclosure and listed for UL applications 1 4 Environmental and Operational Conditions...

Page 5: ...t age underfrequency overfrequency if applicable setpoint ranges for the nominal voltage and frequency setting for a time exceeding 0 5 seconds after the Time Delay Emergency Fail TDEF time delay expi...

Page 6: ...mpact at all times and do not double stack Once the equipment is at the installation site and ready to be installed the packaging material can be removed Refer to Section 4 of this manual for specific...

Page 7: ...Starting TDES This feature provides a time delay of the signal to initiate the engine generator start cycle in order to override momentary power outages or voltage fluctuations of Utility Fixed at 3 S...

Page 8: ...to transfer the load circuit to the Generator power supply All Feature 26 monitoring and protection functions are Fail safe operations 26P All Phase Undervoltage Protection Adjustable Undervoltage Dro...

Page 9: ...are listed for application by UL In addition Eaton ATSs are listed in File E38116 by Underwriters Laboratories Inc under Standard UL 1008 This standard covers the requirements for ATSs intended for us...

Page 10: ...hoose a location that offers a flat rigid mounting surface capa ble of supporting the weight of the enclosed ATS equipment see Figure 8 100 A and 200 A Standard Figure 9 100 A SE Figure 10 200 A SE Pr...

Page 11: ...it www eaton com Instructional Booklet Effective March 2014 Page 11 O M Manual for the RLC1 Automatic Transfer Switch Figure 9 Dimensions and Plan View of SE RLC1 ATS in 100 A Figure 10 Dimensions and...

Page 12: ...ATSs Carefully strip the insulation from the power cables to avoid nick ing or ringing of the conductor strands Prepare the stripped con ductor termination end by cleaning it with a wire brush If alu...

Page 13: ...re 15 the ATS 1 and the generator 2 are connected to the power supply The ATS 1 and emergency distribution panel 3 receive utility power from a dedicated breaker in the utility service panel 4 The ATS...

Page 14: ...nother typical installation for loads can be considered see Figure 17 Refer to Figure 18 for a loads connection dia gram Figure 17 Typical Installation of a Residential or Light Commercial ATS The swi...

Page 15: ...Phase A Utility Phase C Phase B Phase A Generator Phase C Phase B Phase A Generator Utility Utility Generator Control Power Generator K1 Com K1 NO DC_Output Generator Closed K2 Com K2 NO Earth Ground...

Page 16: ...ove terminal block wiring Step 1 Figure 20 shows two tension clamp terminal blocks There is a large one and small one but the operation is the same for both A small tool such as a blade screwdriver wi...

Page 17: ...tral voltages across the generator line terminals to ensure that the generator emergency voltage is correct If necessary make adjustments to the voltage regulator on the generator according to the man...

Page 18: ...or move the lever down to go to generator 7 Once the manual operation is complete and automatic opera tion is desired connect the sources of power 8 Check for 120 Vac at the plug across the Utility Ut...

Page 19: ...ust or foreign matter is present a more frequent maintenance schedule should be followed It is suggested that visual inspections of the equipment be made on a regular basis not just during regularly s...

Page 20: ...the con ductor surfaces due to arcing Inspect the secondary control connections for damage and control wiring for insulation integrity c Inspect the contactor for dust dirt soot grease moisture or co...

Page 21: ...For more information visit www eaton com Instructional Booklet Effective March 2014 Page 21 O M Manual for the RLC1 Automatic Transfer Switch 7 3 Maintenance Log DATE ACTION Example 01 01 04 Inspected...

Page 22: ...rts Table 4 lists the part numbers to use when ordering replacement components To order replacement components contact an authorized Eaton sales repre sentative Figure 25 Field Replaceable Components...

Page 23: ...GROUND CABLE CONNECTIONS NEUTRAL JUMPER NEUTRAL CABLE CONNECTIONS COMPONENT PART NUMBER ATS MODEL Contactor 8160A99G51 100 A Contactor 8160A99G52 200 A ATC 100 Controller ATC 100 100 200 A Harness RL...

Page 24: ...REGARDING THE INFORMATION RECOMMENDATIONS AND DESCRIPTIONS CONTAINED HEREIN In no event will Eaton be responsible to the purchaser or user in contract in tort including negligence strict liability or...

Reviews: