![Eaton Powerware PowerPass 9125 User Manual Download Page 44](http://html1.mh-extra.com/html/eaton/powerware-powerpass-9125/powerware-powerpass-9125_user-manual_4093520044.webp)
OPERATION
EATON
Powerware
®
9125 Two-in-One PDM (5000/6000 VA) User’s Guide
S
164201519 Rev E
www.powerware.com
38
To reinstall the UPS and transfer your equipment from Maintenance
Bypass (AC Line operation) to the UPS:
1.
If optional EBM(s) are installed, reconnect the EBM cable to the
battery connector on the UPS rear panel.
Switch the battery circuit breaker on the first EBM rear panel to the
ON (
|
) position.
2.
Plug the input and output cords of the PDM into the input and
output power connectors on the UPS rear panel (see Figure 15 on
page 30).
The
μ
indicator flashes, indicating the UPS is in Standby mode
with the equipment offline.
3.
Press the On
button on the UPS front panel.
The
μ
indicator illuminates solid.
4.
If the PDM voltage switch is set to 208V, confirm the UPS output
voltage through the front panel (see page 35).
5.
Turn the bypass switch on the PDM to the NORMAL position.
The bar graph indicators display the percentage of load being
applied to the UPS. The UPS is now in Normal mode and supplying
power to your equipment.
6.
Reinstall the PDM front cover.
All manuals and user guides at all-guides.com