INSTALLATION
EATON
Powerware
®
9125 Two-in-One PDM (5000/6000 VA) User’s Guide
S
164201519 Rev E
www.powerware.com
30
5.
Neutral-to-Ground Bonding.
The PDM has a neutral-to-ground (N-G or
neutral-to-earth) bonding screw as required under safety regulations
issued by various regulatory agencies (see Figure 15). If the
neutral-to-ground connection is not needed, remove the screw to
remove the bond between neutral and ground.
6.
Plug the input and output cords of the PDM into the input and
output power connectors on the UPS rear panel (see Figure 15).
PDM Input
Cord
PDM Output
Cord
PDM Input
Connector
PDM L6-30 Output Receptacle
PDM 5-15 Output
Receptacles
PDM Output
Circuit Breaker
REPO Connector
Communication Port
USB Port
UPS Battery
Circuit Breaker
Neutral-to-Ground Bonding Screw
Figure 15. UPS and Plug-Receptacle PDM Installation (L6-30 Model Shown)
7.
Remove the breaker tie from all battery circuit breakers.
8.
Switch all battery circuit breakers to the ON (
|
) position.
9.
If an emergency power-off (disconnect) switch is required by local
codes, see “Remote Emergency Power-off Installation” on page 26
to install the REPO switch before powering on the UPS.
10.
Plug the detachable UPS power cord into the input connector on
the PDM rear panel.
11.
Plug the UPS power cord into an L6-30 power outlet.
The
μ
indicator flashes, indicating the UPS is in Standby mode
with the equipment offline.