Communication
58
Eaton 9355 UPS (20/30kVA) Installation and Operation Manual 164201626—Rev F
www.eaton.com/powerquality
5.
Install the IRC into an open X-Slot communication bay (see Figure 36 on page 51).
6.
To check the operation of the RMP, ensure that the UPS is supplying the load via the inverter or bypass. If
the indicators on the RMP show the appropriate status, then it is operating correctly.
If the RMP is not operating correctly, check the wiring, the fuse on the IRC, and the plug-in terminal blocks
for proper seating. If all connections are secure but the RMP still does not operate correctly, replace the
fuse. If this does not correct the problem, contact your service representative for verification that the
RMP is working correctly.
Figure 44. RMP Top Internal View
Table 3. RMP Wire Terminations
From RMP Terminal
To IRC Terminal
Remarks
J1-1
J1-1
Use Beldon 8690 060 or equivalent
cable
J1-3
J1-3
J1-4
J1-4
J1-5
J1-5
J1-6
J1-6
Plug-in Terminal Block J1 to IRC
NOTE
Conduit and wiring
supplied by the customer. The
maximum distance between
the RMP and the UPS is not to
exceed 500 ft (152.4m).
Summary of Contents for Powerware 9355
Page 1: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Page 2: ......
Page 3: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Page 99: ......
Page 100: ...164201626 D 164201626 F...