![Eaton Powerware 9355 Parallel User Manual Download Page 24](http://html1.mh-extra.com/html/eaton/powerware-9355-parallel/powerware-9355-parallel_user-manual_4271474024.webp)
PARALLEL INSTALLATION
EATON
Powerware
®
9355 Parallel UPS (10/15 kVA) User’s Guide
S
164201601 Rev A
www.powerware.com
18
4.
Determine your equipment’s grounding requirements according to
your local electrical code.
5.
Remove the parallel tie cabinet front cover (see Figure 11).
Figure 11. Parallel Tie Cabinet Front Cover
6.
Remove the internal cover to gain access to the breakers (see
Figure 12).
Internal
Cover
Figure 12. Internal Cover