![Eaton Powerware 9355 Parallel User Manual Download Page 17](http://html1.mh-extra.com/html/eaton/powerware-9355-parallel/powerware-9355-parallel_user-manual_4271474017.webp)
UPS SETUP
EATON
Powerware
®
9355 Parallel UPS (10/15 kVA) User’s Guide
S
164201601 Rev A
www.powerware.com
11
NOTE
Hold the back of the cabinet so that the bolts can be removed easily without the
cabinet rolling backward.
5.
Remove the two M10 bolts securing the front shipping bracket and
remove the bracket.
If needed, adjust the leveling feet to release the bracket.
Stabilizing Bracket
Front Shipping
Bracket
Shipping Pad
M4 Screws
M10 Bolts
M10 Bolts
Figure 3. Removing the Brackets and Shipping Pad
6.
Reinstall the front cover removed in Step 3.
Hang the top edge of the cover on the cabinet first, then lower the
bottom edge and snap into place.