
21
ONGUARD COMMAND CONSOLE INSTALLATION MANUAL
www.eaton.com/onguard
OnGuard Command Console
Installation Manual
SECTION V - Console Electrical Connections
A. Grounding and Bonding the Console
NOTICE
GROUNDING OF THE CONSOLE TO THE BUILDING’S COMMON
GROUNDING SYSTEM MUST BE DONE BY A LICENSED
ELECTRICIAN.
Grounding of the console to the building’s common
grounding system is required� Grounding is made in
accordance with UL 962 standards for household and
commercial furnishings� The bonding connector shall be
attached to any one of the (4) Protective Earth Terminals
(PET) connection points in the console�
The grounding connector must be
attached to the enclosure’s ground point
as shown�
Protective Earth Terminals (PET) are
labelled with proper symbol shown at
right, and are the only terminals to which
the protective earth ground connections shall be attached�
When grounding the console to the building common ground-
ing, it is essential that the main protective ground is connected
and secured to the terminal first with its own star washer and
lock nut before any bonding connections are made on top as
shown below�
B
B
M x 5
N x 5
Hardware
required
B. Plugging the Console In
This product is rated for more than 15 amperes and is for
use on a circuit having a nominal rating of 120 volts and is
equipped with specific electrical plugs to permit connection
to a proper electrical circuit� Make sure that the product is
connected to outlets having the same configuration as the
plugs� No adapter should be used with this product�
Once the console has been connected to the appropriate
outlets, the power strips, lift motor system, and any
electrical accessories plugged into the cabinet’s power
strips will be energized�