13
ONGUARD COMMAND CONSOLE INSTALLATION MANUAL
www.eaton.com/onguard
OnGuard Command Console
Installation Manual
SECTION III - Assembling the Console
For three piece worksurface follow steps 5. and 6. For
single piece worksurface proceed to step 7.
WARNING
LIFT AND POSITION THE PANELS OF A THREE PIECE WORK–
SURFACE ONTO THE CONSOLE SEPARATELY. DO NOT
ATTEMPT TO FASTEN THE PANELS TOGETHER BEFORE LIFTING
AND POSITIONING THEM.
5� Insert (3) tie bolts and (3) non-threaded T washers into
each outer worksurface�
6� Insert plastic splines into the side grooves on each outer
worksurface�
7� Remove the foam edge protectors, then position the
worksurface(s) onto the support frames� Ensure that
the lift control pad cable sits in the groove in the outer
worksurface�
WARNING
AS YOU POSITION THE WORK SURFACE(S) ONTO THE
CONSOLE, MAKE SURE THAT NONE OF THE PREVIOUSLY
ROUTED CABLES BECOME PINCHED.
G x 6
H x 6
Splines
Control Pad
Cable Groove
Hardware required
E�6
E�7