Section 4: Accessory devices
Key lock hole
position
Mounting screw
Operations counter
Mounting panel
Shaft
Interlock lever kit (A)
Circuit breaker lever
Metal spring lever of
interlocking lever kit
installed behind the
circuit breaker rocker
Kit Parts Identification
Refer to Figure 1 for the parts listed below:
(A) Interlock lever assembly
(B) Castell CL 1019 series #FGCL4008 lock can be ordered
with an unique code specified (Castell key lock is not sup-
plied)
(C) Castell lock mounting panel
(D) Interlock adapter
(E) Clamping bracket
(F) Torsion spring
(G) Spring pin
(H) Hexagonal support pin
(I) Tension spring
(J) Connect screw
(K) Support pin screw (1/8-inch shaft shoulder)
(L) Interlocking cable
(M) Fixing pin (M5x0.7)
(N) Interlocking lever
(O) Mounting lock screw (3)
(P) Interlocking lever screw (M3.5x10)
Section 2: Installation of key interlock
Proceed with the following 12 steps:
Step1: To remove the circuit breaker front cover, remove
four square-head hexagonal mounting screws (six for 4
pole breakers) from the front cover. Then pull down on the
charging handle by 45° angle to remove the front cover.
Step 2: Remove the plug from the key lock hole. If there
is no hole, drill a 1-7/16-inch (36mm) hole from the cover
using an existing taper drill, as described in the operation
instruction booklet. Use a hole saw, for example, Starrett #
KAVH0171.
Step 3: The counter and operating spring need to be
removed if installed, and be kept properly for later installa-
tion. Remove the existing counter/lock mounting panel.
Figure 1. Contents of kits
Figure 2. Step 1 and Step 2
Figure 3. Step 3
Figure 4. Step 4
Step 4: Install the interlock lever kit (A) into the shaft as
shown.
(A)
(B)
(C)
(D)
(E)
(G)
(I)
(J)
(H)
(F)
(P)
(L)
(O)
(M)
(K)
(N)