Primary Circuit:

The integrity of primary insulation may be checked by the ac high potential 

test. The test voltage depends upon the maximum rated voltage of the 

circuit breaker. For the circuit breakers rated 4.76 kV, 8.25 kV and 15 kV 

the test voltages are 15 kV, 27 kV and 27 kV RMS, 60 Hz respectively. 

Conduct the test as follows:
Close the circuit breaker. Connect the high potential lead of the test 

machine to one of the poles of the circuit breaker. Connect the remaining 

poles and circuit breaker frame to ground. Start the machine with output 

potential at zero and increase to the test voltage. Maintain the test voltage 

for one minute. Repeat for the remaining poles. Successful withstand 

indicates satisfactory insulation strength of the primary circuit.
Open the circuit breaker. Connect the high potential lead of the test 

machine to one of the poles of the circuit breaker. Connect the remaining 

poles and circuit breaker frame to ground. Start the machine with output 

potential at zero and increase to the test voltage. Maintain the test voltage 

for one minute. Repeat for the remaining poles. Successful withstand 

indicates satisfactory insulation strength of the primary circuit.

 WARNING

APPLYING ABNORMALLY HIGH VOLTAGE ACROSS A PAIR 

OF CONTACTS IN VACUUM MAY PRODUCE X-RADIATION. 

THE RADIATION MAY INCREASE WITH THE INCREASE 

IN VOLTAGE AND/OR DECREASE IN CONTACT SPACING. 

X-RADIATION PRODUCED DURING THIS TEST WITH 

RECOMMENDED VOLTAGE AND NORMAL CONTACT 

SPACING IS EXTREMELY LOW AND WELL BELOW 

MAXIMUM PERMITTED BY STANDARDS. HOWEVER, AS 

A PRECAUTIONARY MEASURE AGAINST POSSIBILITY OF 

APPLICATION OF HIGHER THAN RECOMMENDED VOLTAGE 

AND/OR BELOW NORMAL CONTACT SPACING, IT IS 

RECOMMENDED THAT ALL OPERATING PERSONNEL STAND 

AT LEAST ONE METER AWAY IN FRONT OF THE CIRCUIT 

BREAKER.

Insulation Integrity Test

otee:

N

Roll over each high potential test diagram configuration above to see the  
correct lead connection to the equipment.

otee:

N

The ground connection can be attached to the plated frame.

otee:

N

The secondary disconnect must be grounded during test.

In VR-Series circuit breakers, insulation maintenance 

primarily consists of keeping all insulating surfaces 

clean. This can be done by wiping off all insulating 

surfaces with a dry lint free cloth or dry paper towel. 

In case there is any tightly adhering dirt that will not 

come off by wiping, it can be removed with a mild 

solvent or distilled water. But be sure that the surfaces 

are dry before placing the circuit breaker in service. If 

a solvent is required to cut dirt, use Isopropyl Alcohol 

or commercial equivalent. Secondary control wiring 

requires inspection for tightness of all connections and 

damage to insulation.

Power Frequency Withstand Voltage Testing Configuration: Open Circuit

Power Frequency Withstand Voltage Testing Configuration: Closed Circuit

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS

Lead

C B A

G/R

Lead

OS Lead

     =   Output Signal Lead

G/R Lead

    =   Ground / Return Lead

5

EATON

   |   Visual Instruction Booklet Essentials   |   DST-2-VR - 18WR Element   |   May 2017  

Summary of Contents for DST-2-VR

Page 1: ...For VR Series Circuit Breakers This is a user interactive supplemental booklet This material is intended to enhance the technical information included in the instruction booklet for the vacuum replace...

Page 2: ...on and maintenance of medium voltage circuits and equipment should be permitted to work on these circuit breakers Always remove the circuit breaker from the enclosure before performing any maintenance...

Page 3: ...m Interrupter Assembly Each interrupter is assembled at the factory as a unit to assure correct dimensional relationships between working components The interrupter assembly consists of a vacuum inter...

Page 4: ...ENTIAL TESTS ARE NOT RECOMMENDED BY EATON DO NOT APPLY DC AT ANY LEVEL TO VR SERIES POWER CIRCUIT BREAKERS With the circuit breaker open and securely sitting on the floor connect all top front primary...

Page 5: ...L BELOW MAXIMUM PERMITTED BY STANDARDS HOWEVER AS A PRECAUTIONARY MEASURE AGAINST POSSIBILITY OF APPLICATION OF HIGHER THAN RECOMMENDED VOLTAGE AND OR BELOW NORMAL CONTACT SPACING IT IS RECOMMENDED TH...

Page 6: ...BOTTOM terminal of the phase being tested 8 Press the TEST button on the DLRO Once the TEST button is pressed 100A dc will flow through the phase being tested If the circuit breaker is not closed the...

Page 7: ...ent speed for interruption Stroke is the gap between fixed and moving contacts of a vacuum interrupter with the circuit breaker open The circuit breaker mechanism provides a fixed amount of motion to...

Page 8: ...d the motor eccentric These bearings are packed at the factory with a top grade slow oxidizing grease which normally should be effective for many years They should not be disturbed unless there is def...

Page 9: ...bracket and tighten Do not over tighten Fish wires through to terminal block Connect wires to terminal block TB1 and TB2 Install tie wraps to hold wire bundle Mechanically and electrically test the c...

Page 10: ...k the threads Remove the two screws on the right hand motor support plate using a 9 64in Allen wrench Remove the motor plate from the side sheet for the 5kV circuit breaker Remove the motor Verify the...

Page 11: ...afety Precautions Read and understand the instruction manual for specific instructions before attempting any maintenance repair or testing on the circuit breaker The user is cautioned to observe all r...

Page 12: ...VR Series Circuit Breaker DST 2 5 VR 350 2000A 12 EATON Visual Instruction Booklet Essentials DST 2 VR 18WR Element May 2017...

Page 13: ...VR Series Circuit Breaker DST 2 15 VR 1200A 13 EATON Visual Instruction Booklet Essentials DST 2 VR 18WR Element May 2017...

Page 14: ...nts and engineering services Eaton is positioned through its global solutions to answer today s most critical electrical power management challenges Eaton is a power management company with 2015 sales...

Reviews: