Instruction Leaflet
IL29C092E
Effective November 2013
Installation Instructions for KD, HKD, KDC, CKD
CHKD, Circuit Breakers with Digitrip OPTIM
Trip Unit and Powernet and/or Zone Interlock
EATON CORPORATION
www.eaton.com
through one phase of the breaker, returning through the
neutral sensor, as shown in Figure 4-3. The breaker
should not trip, and the alarm indicator, if supplied,
should not operate. Repeat the test on the other two
phases.
lf the system is a 3-wire system with no neutral current
sensor, apply the same current as described above
through any two phases of the breaker, with the connec-
tions exactly as shown in Figure 4-4. The breaker
should not trip, and the alarm indicator, if supplied,
should not operate. Repeat the test using the other two
combinations of breaker phases.
CAUTION
GROUND FAULT TEST RECORD FORM
Ground Fault Test Records should be Retained by Those in Charge of the Building’s
FIELD TESTING SHOULD BE USED FOR FUNCTION-
AL TESTING AND NOT FIELD CALIBRATION OF
THE DIGITRIP OPTIM GROUND FAULT TRIP UNIT.
Electrical Installation in
Test Date
ANY TEMPORARY CONNECTION MADE FOR THE
PURPOSE OF CONDUCTING TESTS SHOULD BE
RESTORED TO PROPER OPERATING CONDITION
Figure 4-1 Typical PerformanceTest Record Form
The results of the test are to be recorded on the test
form provided with the equipment.
order to be available
Circuit
Breaker
Number
LOW
Voltage
Load
Current
Resistor
(if required)
to the Authority having Jurisdiction.
LOW
Load
Current
Resistor
(if
Figure 4-2 Connections for
Figure 4-3 Connections for
Ground Fault Trip Test
Ground Fault No-Trip Test, with
a Four-Wire System
Tested By
I
LOW
Voltage
Resistor
(if required)
Figure 4-4 Connections for
Ground Fault No-Trip Test, with
a Three-Wire System
BEFORE RETURNING THE BREAKER TO SERVICE.
Results