background image

Eaton 

Residential loadcenter and circuit breakers

Installation tips

 

CH & BR plug-on neutral loadcenters and circuit breakers

Green bonding screw

• 

The green bonding screw 

comes unthreaded. 

• 

When required to bond the 

ground and neutral, thread the 

green bonding screw into case 

with 40 in-lbs of torque.

• 

For applications when the 

ground and neutral should 

not be bonded, it is recom-

mended that the green screw 

is removed entirely and 

discarded.

Main breaker loadcenters 

and terminal insulators

• 

Install terminal insulators to 

the service entry cable and 

line-side lugs of the main 

breaker device. 

• 

All 225A and smaller main 

breaker loadcenters ship from 

the factory with a terminal 

insulator kit.

• 

The terminal insulator kit will 

need to be purchased sepa-

rately for main breaker load-

centers greater than 225A.

Ordering a convertible 

loadcenter

• 

To order a convertible loadcen-

ter, select a loadcenter catalog 

number with “

N

” or “

E

” as 

the main device designation. 

• 

N

” indicates convertible load-

center with no main device 

installed at factory.

• 

E

” indicates convertible 

loadcenter with main lugs 

installed. 

Drywall offsets tabs

• 

For flush mount applications, 

utilize the drywall offsets at 

the top and bottom on both 

sides of the loadcenter.

• 

Push the tabs out 90 degrees 

so that they are perpendicular 

to the side of the loadcenter. 

• 

When installing the loadcenter 

between studs, the tabs help 

provide the proper drywall 

offset.

Keyhole hanging feature

• 

Take advantage of the 

keyhole hanging feature for 

an easy and hassle free cover 

installation. 

• 

Place the top two cover 

screws in the loadcenter 

case holes. Then, align the 

top two cover keyholes with 

the top two cover screws to 

easily hang the cover. 

• 

The cover keyhole hanging 

feature also works for 

bottom feed applications.

Torque rating

• 

The torque rating information 

can be found on the loadcen-

ter PUB. Refer to the chart 

on the PUB for the specific 

torque value required. After 

referencing the chart, use a 

torque wrench to torque to 

the specified value.

Reviews: