4
Instruction Leaflet
IL157002EN
Effective July 2019
Eaton BLR-ACX
Quick commissioning guide
EATON
www.eaton.com
Main screen
Measurement Mode
U Voltage ULL (V)
▼
U Voltage ULN (V)
▼
I Current (A)
▼
P active power (W)
▼
Q reactive power (VAR)
▼
∆ Q reactive power to target
▼
S apparent power (VA)
▼
THD U
▼
Har U (3rd harmonic U)
▼
Har U (5th harmonic U)
▼
Har U (7th harmonic U)
.
.
.
Har U (19th harmonic U)
▼
COS Phi (displacement power factor)
▼
PF (kW/kVA)
▼
APF (average power factor)
▼
F (frequency)
▼
t (temperature)
▼
thi (maximum temperature)
▼
OPh (operation hours)
Manual Mode
1 (Step 1)
▼
ON
▼
OFF
▼
2 (Step 2)
▼
ON
▼
OFF
▼
3 (Step 3)
▼
ON
▼
OFF
.
.
.
13 (Step 13)
▼
ON
▼
OFF
▼
14 (Step 14)
▼
ON
▼
OFF
Basic Programming Mode
(100 level menu)
Un (nominal voltage ULL)
▼
CT (CT ratio)
▼
PT (PT or VT ratio)
▼
Ai (automatic initializing)
▼
PFC (power factor control on/off)
▼
CP1 (target power factor)
▼
St (switching time delay)
▼
Out (outputs)
a
Setup
Advanced Programming Mode
(200–600 level menus
push
▼
key for 3–5 seconds
Note:
Pressing the down arrow will take the
user back to the top of the list .
Note:
Pressing the down arrow again after 14
(Step 14) will take the user back to 1 (Step 1) .
Manual screen
Setup screen
Basic programming screen
a
Firmware version dependent.
Note:
Pressing the down arrow key after Out
will take the user back to the top of the list .
Push the right arrow
key for 3–5 seconds .
Push the right arrow
key for 3–5 seconds .
INFO
Push the right arrow
key for 1 second .
Figure 3. Menu map