3
Instruction Leaflet
IL157002EN
Effective July 2019
Eaton BLR-ACX
Quick commissioning guide
EATON
www.eaton.com
Overview
BLR-ACX is factory preset to the default values shown in
Table 1
.
Customer to program and verify the values set to meet the specific
conditions of each installation .
Step 3
The next step is to verify the measured values .
In the main screen press the
▼
( right / Enter) key to enter the
Measurement menu . The following parameters are displayed .
To enable measurement values, the CT ratio has to be set .
Otherwise only voltage dependent measurement values are
displayed accurately . The shaded fields shown in
Figure 3
are
hidden and will only appear if the CT ratio is set in the menu .
Step 4
The final step in commissioning is to verify the working of the
capacitor bank . This is done by activating the controller in manual
control mode and cycling through all the available steps .
Note that
the steps will switch on only after the factory set capacitor
stage discharge time has elapsed
.
After each manual operation of the stage, the PF should change in
the right direction . (For example 0 .70 i >> 0 .78 i >> 0 .85 i…) .
If the PF changes in the right direction, the capacitor bank
has been correctly commissioned
. If not, please refer to the
troubleshooting section .
To switch the controller in manual control mode, press
the
▼
(down) key to step through the “INFO” mode to
“MANUAL” mode. Press and hold the
▼
( right /Enter)
key for approximately 3 seconds until “1” displays indicating
the stage number 1 is available for control.
Note that in manual mode, the controller freezes the stages
in their existing state (ON, OFF or HOLD). Therefore it is
important to ensure that at the end of this step 4, the
controller is returned back to the automatic control mode
by pressing the
▼
(left / esc) key to return to the main screen
that displays the existing PF.
After activating all available steps, one should make note of the
displayed PF value as that reading should be greater than or equal to
the target PF desired . If the displayed PF with all steps energized is
less than the target PF, then the selected capacitor bank is not sized
adequately to raise the PF to the desired value . The customer should
either upgrade the capacity of the capacitor bank or the target PF
value should be decreased to prevent “PF alarms” .