Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 5. Moving the Battery Pallet
Pallet Rear
Pallet Front
Note: Battery cartons for five and six UPS systems only.
NOTE
You will install the batteries in the top two UPS cabinets after the system is installed in
the final location.
7.
Continue to section
”Installing the Ramp”.
33..66
IInnssttaalllliinngg tthhee R
Raam
mpp
To install the ramp:
1.
Remove the outer plastic wrap and the four protective cardboard corners from the system.
2.
Discard or recycle the packaging in a responsible manner, or store it for future use.
3.
Locate the ramp on the back of the cabinet. Hold the ramp in place while you cut the strap that binds it to
the system (see
CAUTION
If not held in place when the strap is cut, the ramp can fall and cause injury.
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...