Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 75. Installing Communication Cables
2.
Connect the cables to the appropriate location. See
or
for detailed information.
See for detailed information.
3.
Route and tie the cable(s) out of the way.
4.
Continue to to start up the UPS.
66..33
C
Coom
mm
muunniiccaattiioonn O
Oppttiioonnss
The BladeUPS has serial communication capabilities through the DB-9 communication port or through an X-Slot
card in one of the available bays.
The UPS supports two serial communication devices according to the following table:
Table 16. Supported Communication Devices
Independent
Multiplexed
X-Slot 1 Communication Bay
X-Slot 2 Communication Bay
DB-9 Communication Port
Any X-Slot card
Any X-Slot card
Not in use
Any X-Slot card
Eaton Relay Interface Card
Powerware Hot Sync CAN Bridge Card
Available
Any X-Slot card
Not in use
Available
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...