INSTALLATION
Eaton BladeUPS Bar Installation Guide
S
164201723 Rev 2
www.eaton.com/powerquality
7
BladeUPS Bar Installation (Bottom Entry Wireway)
To install the BladeUPS Bar in a bottom entry rack:
1.
Remove the access cover and terminal block housing from the
wireway housing (see Figure 2). Retain the wireway terminal block
housing, wireway access cover, and screws. Leave the two side
brackets installed on the wireway housing (see side bracket
locations in Figure 3).
2.
Verify that the side brackets are in the most closed position and
that the adjustment screws are tightened to prevent the side
brackets from moving.
C
A
U
T
I
O
N
If the side brackets are loose, they can move during wireway placement and cause injury.
Wireway
Terminal Block
Housing
Wireway Access Cover
Wireway
Housing
M6
12 Hex Bolts
(2 places)
M4
8 Pan-Head Screws
(9 places)
Figure 2. Wireway Disassembly
3.
Place the wireway housing into the bottom of the rack so that the
adjustable side brackets are nearest the front of the rack (see
Figure 3).